My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Another coverage we asked for a quote on was Equipment Breakdown. Most cities have <br />the following types of machinery, all of which would be covered: wastewater system <br />equipment such as pumps, agitators, air systems, electronic controls, motors, etc.; air <br />conditioning and heating equipment; water system pumps, motors, etc.; Electrical wiring, <br />breakers, transformers, switches, etc; telephone switchboard and related equipment. The cost <br />for this coverage is $1,980 and there would be a $500 deductible. Staff does not recommend <br />the addition of this coverage. <br />I have attached our summary sheet with the premium breakdowns for property/casualty coverage. If <br />you have questions after reviewing this, please let me know. <br />
The URL can be used to link to this page
Your browser does not support the video tag.