My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joel Hanson <br />From: Joel Hanson <br />Sent: 'Tuesday, December 31, 2013 2:26 PM <br />To: Brenda Dever' <br />Cc: Jeff Oertel; Thomas Stromsodt' <br />Subject: RE: Draft AIA Contract B132 <br />I have gone through the contract. Because it is a PDF., 1 can't make changes. <br />Here are my comments: <br />1. Date of agreement will be January 6111, 2014. <br />V' 2. James Steele Construction is located in St. Paul, not Little Canada. <br />t3. 1.1.5 — Please check multiple prime contractors. <br />4. 1.1.10.5 — Elfering's Address is: <br />Elfering & Associates <br />10062 Flanders Court, NE <br />Blaine, MN 55449 <br />v 5. 2.6.1 & 2.6.2 - The limits seem a little low. I would assume you have about $5,000,000 GL and at least <br />$2,000,000 Auto. I would like your limits to at least be as high (ideally higher) than the city's statutory <br />limits. <br />6. 3.2 — Schematic Design Phase — no mention of your proposed "Predesign Services" including a <br />functional space analysis that was mentioned in your interview using the computer program that <br />incorporates existing equipment inventories into the analysis. <br />7. 3.2.4 — limited to one preliminary design. I believe your proposal indicates more than one. <br />8. 3.4.3 — I would like the following sentence added at the end of this paragraph: It is understood that bid <br />packages will be structured the Owner to take advantage of the Owner's sales tax exempt status for <br />direct material purchases. <br />9. 3.6.6.4 — delete the words: "Upon request of the Owner, and" and then capitalize the "p" on Prior. <br />/10.4.1 — Additional Services: Page 6 of your proposal indicates that 4.1.20 and 4.1.21 will be part of the <br />base services. <br />v'` 11. 4.3.1.2 — Please add the following to the beginning of the paragraph: After the Owner's approval of <br />construction documents,. <br />V 12. 4.3.1.6 — delete as I would think this is pretty standard today. If not, please enlighten me. <br />13. 4.3.1.7 — I'm not sure about this one. I can understand that if significant design time is involved in the <br />preparation of an alternate, then compensation may be necessary. However, that may not always be the <br />case. I think we need to talk about this to make sure we are on the same page. <br />2 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.