My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF ARTICLES <br />1 INITIAL INFORMATION <br />2 ARCHITECT'S RESPONSIBILITIES <br />3 SCOPE OF ARCHITECTS BASIC SERVICES <br />4 ADDITIONAL SERVICES <br />5 OWNER'S RESPONSIBILITIES <br />6 COST OF THE WORK <br />7 COPYRIGHTS AND LICENSES <br />8 CLAIMS AND DISPUTES <br />9 TERMINATION OR SUSPENSION <br />10 MISCELLANEOUS PROVISIONS <br />11 COMPENSATION <br />12 SPECIAL TERMS AND CONDITIONS <br />13 SCOPE OF THE AGREEMENT <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br />(Note the disposition for the following items• by inserting the requested information or a statement such as. "not <br />applicable," "unknown at time of execution" or to be determined later by mutual agreement') <br />§ 1.1.1 The Owner's program for the Project: <br />(!dent fy doconentaton or state the manner in which the program will be developed.) <br />§ 1.1.2 The Project's physical characteristics: <br />(!dent fy or describe, if appropriate, size, location, dimensions, or other pertinent information, such as geotechnical <br />reports; site, boundary and topographic surveys; truffle and utility studies; availability of nubile and private utilities <br />and services; legal description of the site; etc.) <br />§ 1.1.3 The Owner's budget for the Cost of the Work, as defined in Section 6.1: <br />(Provide total and, if known, a line item breakdown) <br />t<) <br />§ 1.1.4 The Owner's anticipated design and construction schedule: <br />.1 Design phase milestone dates, if any: <br />«Final Design Packages/ Bidding- March 7'" -2014 '> <br />.2 Commencement of construction: <br />All) Document 0132" - 2009 (formerly 13141'oa - 1992). Copy <br />This draft was produce <br />ocpi ros on 10/20/2011, and Is not for resale. <br />Vsor Notes: <br />6 <br />992 and 2009 by The Arorican Instil:ie of Architects. All rights <br />AIA software at 08:51.35 on 12/23/2012 ender Order ite./359100113_1 which <br />u95319em3t <br />
The URL can be used to link to this page
Your browser does not support the video tag.