Laserfiche WebLink
§ 3.5 Bidding or Negotiation Phase Services <br />§ 3.5.1 General <br />The Architect shall assist the Owner and Construction Manager in establishing a list of prospective contractors. <br />Following the Owner's approval of the Construction Documents, the Architect shall assist the Owner and <br />Construction Manager in (I) obtaining either competitive bids or negotiated proposals; (2) confirming <br />responsiveness of bids or proposals; (3) determining the successful bid or proposal, if any; and (4) awarding and <br />preparing contracts for construction. <br />§ 3.5.2 Competitive Bidding <br />§ 3.5.2.1 Bidding Documents shall consist of bidding requirements and proposed Contract Documents. <br />§ 3.522 The Architect shall assist the Owner and Construction Manager in bidding the Project by <br />.1 facilitating the reproduction of Bidding Documents for distribution to prospective bidders, <br />.2 participating in a pre -bid conference for prospective bidders, and <br />.3 preparing responses to questions from prospective bidders and providing clarifications and <br />interpretations of the Bidding Documents in the form of addenda. <br />§ 3.5.2.3 The Architect shall consider requests for substitutions, if the Bidding Documents permit substitutions, and <br />shall consult with the Construction Manager and prepare and distribute addenda identifying approved substitutions <br />to all prospective bidders. <br />§ 3.5.3 Negotiated Proposals <br />§ 3.5.3:1 Proposal Documents shall consist of proposal requirements, and proposed Contract Documents. <br />§ 3.5.3.2 The Architect shall assist the Owner and Construction Manager in obtaining proposals by <br />.1 facilitating the reproduction of Proposal Documents for distribution to prospective contractors, and <br />requesting their return upon completion of the negotiation process; <br />.2 participating in selection interviews with prospective contractors; and <br />.3 participating in negotiations with prospective contractors. <br />§ 3.5.3.3 The Architect shall consider requests for substitutions, if the Proposal Documents permit substitutions, and <br />shall consult with the Construction Manager and prepare and distribute addenda identifying approved substitutions <br />to all prospective contractors. <br />§ 3.6 Construction Phase Services <br />§ 3.6.1 General <br />§ 3.6.1.1 The Architect shall provide administration of the Contract between the Owner and the Contractor as set <br />forth below and in AIA Document A232T14-2009, General Conditions of the Contract for Construction, Construction <br />Manager as Adviser Edition. if the Owner and Contractor modify AIA Document A232 -2009, those modifications <br />shall not affect the Architect's services under this Agreement unless the Owner and the Architect amend this <br />Agreement. <br />§ 3.6.1.2 The Architect shall advise and consult with the Owner and Construction Manager during the Construction <br />Phase Services. The Architect shall have authority to act on behalf of the Owner only to the extent provided in this <br />Agreement. The Architect shalt not have control over, charge of, or responsibility for the construction means, <br />methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, <br />nor shall the Architect be responsible for the Contractor's failure to perform the Work in accordance with the <br />requirements of the Contract Documents. The Architect shall be responsible for the Architect's negligent acts or <br />omissions, but shall not have control over or charge of, and shall not be responsible for, acts or omissions of the <br />Construction Manager, or the Contractor or of any other persons or entities performing portions of the Work. <br />§ 3.6.1.3 Subject to Section 4.3, the Architect's responsibility to provide Construction Phase Services commences <br />with the award of the Contract for Construction and terminates on the date the Architect issues the final Certificate <br />for Payment. <br />Ant Document 1113219 - 2009 (fox/early 0141°0n - 19921. Copyrt(Iht c. 1922 and 2009 by The AuKtriCan last itete at Architects. All nghta <br />reserved. 1' /I I C Ma' Inann:ann a 1 1 :, Law a ci 1 <br />trIli\...[n .1. :Lnn A A nonun,na. :•' any a..l..:.,.t l :And nun., ..:._. .4111 :r (. :. :c .c 9 <br />naircn cr 0/ 0/ 011,E and is This draft was P %;oriucetl by AIA fiofhmKC of Ofr.4l: 3'v UII 31%2:1/203) under Orden' Ite.'I'I09I0014J 1 which <br />User t' Noes 14/10/2014, and is not [m: resale. .. <br />User Notes: 1195: +:961:) <br />13 <br />