My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.12 Assistance to the Initial Decision Maker, if other than the Architect. <br />§ 43.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Services, <br />notify the Owner with reasonable promptness, and explain the facts and circumstances giving rise to the need. If the <br />Owner subsequently determines that all or parts of those services are not required, the Owner shall give prompt <br />written notice to the Architect, and the Owner shall have no further obligation to compensate the Architect for those <br />services: <br />.1 Reviewing a Contractor's submittal out of sequence from the initial Project submittal schedule agreed <br />to by the Architect; <br />.2 Responding to the Contractor's requests for information that are not prepared in accordance with the <br />Contract Documents or where such information is available to the Contractor from a careful study <br />and comparison of the Contract Documents, field conditions, other Owner - provided information, <br />Contractor - prepared coordination drawings, or prior Project correspondence or documentation; <br />.3 Preparing Change Orders, and Construction Change Directives that require evaluation of Contractor's <br />proposals and supporting data, or the preparation or revision of Instruments of Service; <br />.4 Evaluating an extensive number of Claims as the Initial Decision Maker; <br />.5 Evaluating substitutions proposed by the Owner, Construction Manager or Contractor and raking <br />subsequent revisions to Instruments of Service resulting therefrom; or <br />.6 To the extent the Architect's Basic Services are affected, providing Construction Phase Services 60 <br />days after (1) the date of Substantial Completion of the Work or (2) the anticipated date of Substantial <br />Completion, identified in Initial Information, whichever is earlier. <br />§ 4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional <br />Services. When the limits below are reached, the Architect shall notify the Owner: <br />.1 «: Five :» ( «.5 » ) reviews of each Shop Drawing, Product Data item, sample and similar submittals of <br />the Contractor <br />.2 «Thirty =two» ( «32 -» ) visits to the site by the Architect over the duration of the Project during <br />construction <br />e-Werk o- determine- whether- stteh-portion- ef- tlte- Werk -is <br />.4 (l n((( 1)) Iflspeetions-tb <br />§ 4.3.4 If the services covered by this Agreement have not been completed within « » (« » ) months of the date of <br />this Agreement, through no fault of the Architect, extension of the Architect's services beyond that time shall be <br />compensated as Additional Services. <br />ARTICLE 5 OWNER'S RESPONSIBILITIES <br />§ 5.1 Unless otherwise provided for under this Agreement, the Owner shall provide information in a timely manner <br />regarding requirements for and limitations on the Project, including a written program which shall set forth the <br />Owner's objectives, schedule, constraints and criteria, ' - • • • , flexibility, <br />expandability, special equipment, systems and site requirements. Within 15 days after receipt of a written request <br />from the Architect, the Owner shall furnish the requested information as necessary and relevant for the Architect to <br />evaluate, give notice of or enforce lien rights. <br />§ 5.2 The Owner shall retain a Construction Manager to provide services, duties and responsibilities as described in <br />AIA Document CI32 -2009, Standard Form of Agreement Between Owner and Construction Manager. The Owner <br />shall provide the Architect a copy of the executed agreement between the Owner and the Construction Manager, and <br />any further modifications to the agreement. <br />§ 5.3 The Owner shall furnish the services of a Construction Manager that shall be responsible for creating the <br />overall Project schedule. The Owner shall adjust the Project schedule, if necessary, as the Project proceeds. <br />§ 5.4 The Owner shall establish and periodically update the Owner's budget for the Project, including (I) the budget <br />for the Cost of the Work as defined in Section 6.1, (2) the Owner's other costs, and (3) reasonable contingencies <br />related to all of these costs. The Owner shall furnish the services of a Construction Manager that shall be responsible <br />for preparing all estimates of the Cost of the Work. If the Owner significantly increases or decreases the Owner's <br />budget for the Cost of the Work, the Owner shall notify the Architect and the Construction Manager. The Owner and <br />MA Document 0132"' - 2009 (formerly 014l'OHa - 1992)• Copyright -s 1992 and 2009 by The A:cerican Innti tune of Architects. All niches <br />19 <br />. This theft n.s pied ced h1 Ali, software at 90 11 3L on 12/23/2013 eider Order 70.7759100113_1 v.hi <br />expires on 10/20/2014, and is not for resole. <br />User Notes: (1913196153) <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.