Laserfiche WebLink
§ 5.14 The Owner shall provide the Architect access to the Project site prior to commencement of the Work and shall <br />obligate the Construction Manager and Contractor to provide the Architect access to the Work wherever it is in <br />preparation or progress. <br />ARTICLE 6 COST OF THE WORK <br />§ 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all <br />elements of the Project designed or specified by the Architect and shall include the contractors' general conditions <br />costs, overhead and profit. The Cost of the Work includes the compensation of the Construction Manager and <br />Construction Manager's consultants during the Construction Phase only, including compensation for reimbursable <br />expenses at the job site, if any. The Cost of the Work does not include the compensation of the Architect, fees <br />associated with Owner provided services (Civil Eneineeringl. the costs of the land, rights -of -way, financing, <br />contingencies for changes in the Work or other costs that are the responsibility of the Owner. <br />§ 6.2 The Owner's budget for the Cost of the Work is provided in Initial Information, and may be adjusted <br />throughout the Project as required under Sections 5.4 and 6.4. Evaluations of the Owner's budget for the Cost of the <br />Work represent the Architect's judgment as a design professional. <br />§ 6.3 The Owner shall require the Construction Manager to include appropriate contingencies for design, bidding or <br />negotiating, price escalation, and market conditions in estimates of the Cost of the Work. The Architect shall be <br />entitled to rely on the accuracy and completeness of estimates of the Cost of the Work the Construction Manager <br />prepares as the Architect progresses with its Basic Services. The Architect shall prepare, as an Additional Service, <br />revisions to the Drawings, Specifications or other documents required due to the Construction Manager's <br />inaccuracies or incompleteness in preparing cost estimates. The Architect may review the Construction Manager's <br />estimates solely for the Architect's guidance in completion of its services, however, the Architect shall report to the <br />Owner any material inaccuracies and inconsistencies noted during any such review. <br />§ 6.3.1 If the Architect is providing detailed cost estimating services as an Additional Service, and a discrepancy <br />exists between the Construction Manager's cost estimates and the Architect's cost estimates, the Architect and the <br />Construction Manager shall work cooperatively to °enfom) the cost estimates to one another. <br />§ 6.41f, prior to the conclusion of the Design Development Phase, the Construction Manager's estimate of the Cost <br />of the Work exceeds the Owner's budget for the Cost of the Work, the Architect, in consultation with the <br />Construction Manager, shall make appropriate recommendations to the Owner to adjust the Project's size, quality or <br />budget, and the Owner shall cooperate with the Architect in making such adjustments. <br />§ 6.5 If the estimate of the Cost of the Work at the conclusion of the Design Development Phase exceeds the <br />Owner's budget for the Cost of the Work, the Owner shall <br />.1 give written approval of an increase in the budget for the Cost of the Work; <br />.2 in consultation with the Architect and Construction Manager, revise the Project program, scope, or <br />quality as required to reduce the Cost of the Work; or <br />.3 implement any other mutually acceptable alternative. <br />§ 6.6 if the Owner chooses to proceed under Section 6.5.2, the Architect, without additional compensation, shall <br />incorporate the required modifications in the Construction Documents Phase as necessary to comply with the <br />Owner's budget for the Cost of the Work at the conclusion of the Design Development Phase Services, or the budget <br />as adjusted under Section 6.5.1. The Architect's modification of the Construction Documents shall be the limit of <br />the Architect's responsibility as a Basic Service under this Article 6. <br />§ 6.7 After incorporation of modifications under Section 6.6, the Architect shall, as an Additional Service, make any <br />required revisions to the Drawings, Specifications or other documents necessitated by subsequent cost estimates that <br />exceed the Owner's budget for the Cost of the Work, except when the excess is due to changes initiated by the <br />Architect in scope, basic systems, or the kinds and quality of materials, finishes or equipment. <br />ARTICLE 7 COPYRIGHTS AND LICENSES <br />§ 7.1 The Architect and the Owner warrant that in transmitting Instruments of Service, or any other information, the <br />transmitting party is the copyright owner of such information or has permission from the copyright owner to <br />transmit such information for its use on the Project. If the Owner and Architect intend to transmit Instruments of <br />AIA Docwont 9132° - 2009 (formerly 1(1415tMa - 1992). Copyright 3992 and 2009 by The Aincricen Institute of Architects,. N1 rights <br />ros *xved. Th,ut '.'oroo . . C..r , :1 :: :.:, ,L. roptetika,tiion 01: <br />I1Au' soft es, ro t•. :53 2 <br />oswi droft woo p[euncUO by AIA snf tNnrO nt. 00:01 JS on ]9 /)3 /)OIJ under orUCt 8s,. ":4541 e¢ 4d 1 mnren <br />User roe on 10/20/2014, and 15 not for ec. ^.nlrt. " <br />User Notes: <br />119531961 :a) <br />20 <br />16 <br />