Laserfiche WebLink
a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />Lot dimensions and area. <br />Dimensions of proposed and existing <br />structures. <br />"Typical" floor plan and "typical" room plan. <br />Setbacks of all buildings located on property <br />in question. <br />Proposed setbacks. <br />Sanitary sewer and water plan with estimated <br />use per day. <br />3. Grading Plan, which shall include: <br />a. Existing contour. <br />b. Proposed grading elevations. <br />c. Drainage configuration. <br />d. Storm sewer catch basins and invert <br />elevations. <br />e. Spot elevations. <br />f. Proposed road profile. <br />4. Landscape Plan, which shall include: <br />a. <br />b. <br />c. <br />Location <br />diameter, <br />Location, <br />plantings <br />Location <br />devices. <br />of all existing trees, type, <br />and which trees will be removed. <br />type and diameter of all proposed <br />and material used of all screening <br />5. Legal description of property under consideration. <br />6. Proof of ownership of the land for which a <br />conditional use permit is requested. <br />C. Lapse of Conditional Use Permit by Non -Use. Whenever <br />within one (1) year after granting a conditional use <br />permit, the use as permitted by the permit shall not have <br />been completed or utilized, then such permit shall become <br />null and void unless a petition for an extension of time <br />in which to complete or utilize the use that has been <br />approved by the City Council. Such extension shall be <br />requested in writing and filed with the Zoning <br />Administrator at least thirty (30) days before the <br />expiration of the original conditional use permit. There <br />shall be no charge for the filing of such petition. The <br />request for extension shall state facts showing a good <br />faith attempt to complete or utilize the use permitted in <br />the conditional use permit. Such petition shall be <br />presented to the Planning Commission for a recommendation <br />and to the City Council for a decision. <br />D. Performance Bond. In the case of conditional use permit <br />-198- <br />Page 23 <br />