Laserfiche WebLink
VIKING DRIVE WATER MAIN IMPROVEMENT PROJECT <br />Citizen Information Meeting <br />November 21, 1994 6:30 pm <br />PROJECT SUMMARY <br />Scope: To provide City water to the residents on Viking Drive, east of Edgerton Avenue. <br />Cost: Alignment #1 (through the yards) = $94,300 <br />Alignment #2 (along the south ditch) = $104,000 <br />Revenue: <br />Assessments to residents: <br />City costs: <br />Align. #1 Align. #2 <br />$41,400 $41,400 <br />$52,900 $62,600 <br />$94,300 $104,000 <br />Since the Viking Drive water main issue was last addressed, the City has adopted a <br />new assessment policy for water main, limiting the assessed amount to approximately <br />$4,600 per buildable lot. <br />OTHER RELATED ISSUES <br />Street Improvements: <br />Should street improvements be considered in conjunction with this project (especially <br />if the "ditch alignment" is pursued, since some of the roadway will be removed and <br />replaced)? The current condition of the pavement is fair, and is beginning to <br />deteriorate at an accelerated pace. <br />The City's street policy states that all rural (no curb and gutter) streets should be <br />improved to urban standards (concrete curb and gutter). In doing so, the width of <br />Viking Drive would be increased from approximately 24 feet to 28 feet. Assessment <br />rates would be expected in the range of approximately $42.00 to $52.00 per front foot <br />of property ($4,200 to $5,200 for a typical 100 foot lot). <br />Page 9 <br />