CHANGE ORDER #1 <br />(Attachment) <br />This contract is amended as follows: <br />WHEREAS: It was determined that the connection point to the existing storm sewer line on <br />Schletty Drive had to be at a lower elevation due to utility conflicts; and <br />WHEREAS: The Engineer determined that the existing structure should be relocated down <br />the existing line to provide this extra depth; and <br />WHEREAS: It was determined that a sump pump discharge had caused icy street conditions <br />in the past and the engineer determined this discharge line should be connected <br />into the new storm sewer structure to eliminate this problem; and <br />WHEREAS: It was determined while the storm sewer was being installed that some of the <br />water services and main line watermain should be insulated to protect against <br />possible freezing; and <br />WHEREAS: It was determined that an old watermain casing that was discovered during the <br />storm sewer excavation was in conflict with the storm sewer alignment and a <br />portion had to be removed; and <br />WHEREAS: It was determined that due to the angle that the existing hydrant tee was coming <br />off the mainline watermain two bends would be necessary to provide the correct <br />depth for the hydrant relocation; and <br />WHEREAS: It was determined that an existing water service was to in conflict and had to be <br />relocated and insulated due to the bury depth required on the wall design, and <br />WHEREAS: The Engineer determined that it would be more cost effective to complete the <br />work will the street was disturbed and under the existing contract, and <br />WHEREAS: The Engineer directed the Contractor to complete the work on a time and <br />material basis as part of this project. <br />NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: <br />1. The Contractor shall complete the above described changes and additions to the project. <br />2. Payment for the work was reviewed and approved by the Engineer. <br />3. The Contractor will not make claim of any kind or character for any other costs or <br />expenses that he may have incurred or that he may hereafter incur in performing the <br />work or furnishing the materials of this agreement. <br />GENERAL CONDITIONS 00700 - 2 <br />6 <br />