Laserfiche WebLink
OPTION 1- GRAVITY SEWER ON PILINGS <br />ITEM <br />UNIT <br />UNIT QUANTITY COST COST <br />LATERAL LINE <br />Traffic control L.S. 1 $500.00 $500 <br />Connect to existing tee manhole Ea. I $1,000.00 $1,000 <br />8" DIP Cl. 53 on piling, 10' -14' deep L.F. 310 $32.00 $9,920 <br />Treated timber piling delivered L.F. 800 $19.00 $15,200 <br />Treated timber piling driven L.F. 800 $10.00 $8,000 <br />Treated timber test pile, 60 feet long Ea. 2 $2,800.00 $5,600 <br />Pile bent cap and saddle Ea. 16 $1,200.00 $19,200 <br />Manhole pile cap Ea. 3 $2,200.00 $6,600 <br />Standard 4' dia. MH w /casting on piling Ea. 3 $1,500.00 $4,500 <br />4' dia. depth greater than 8' L.F. 14 $90.00 $1,260 <br />Mechanical trench compaction L.F. 310 $2.00 $620 <br />On site testing (related to piling) LS. 1 $1,500.00 $1,500 <br />Seed w /mulch, fertilizer & 4" topsoil Ac. 0.75 $1,500.00 $1,125 <br />Television inspection LF. 310 $0.65 $202 <br />TOTAL EST. CONSTRUCTION <br />+10% CONTINGENCIES <br />+30% OTHER DIRECT COSTS <br />+ EASEMENTS <br />$75,227 <br />$7,523 <br />$82,749 <br />$24,825 <br />$3,000 <br />TOTAL LAI ERAL COST $110,574 <br />FRATTALONE SERVICE <br />Traffic control L.S. I $1,000.00 $1,000 <br />Remove bituminous surface S.Y. 100 $3.00 $300 <br />Remove concrete curb and gutter L.F. 50 $4.00 $200 <br />Class 5 aggregate Ton 80 $10.00 $800 <br />2331 bituminous base Ton 13 $55.00 $715 <br />2341 bituminous base Ton 13 $55.00 $715 <br />Tack Gal 5 $2.00 $10 <br />Treated timber piling delivered L.F. 250 $19.00 $4,750 <br />Treated timber piling driven L.F. 250 $10.00 $2,500 <br />Pile bent cap and saddle Ea. 5 $1,200.00 $6,000 <br />8 "x 4" DIP tee (service wye) Ea. 1 $350.00 $350 <br />4" DIP service line on piling L.F. 90 $15.00 $1,350 <br />Mechanical trench compaction L.F. 90 $2.00 $180 <br />Seed w /mulch, fertilizer & 4" topsoil Ac. 0.25 $1,500.00 $375 <br />TOTAL EST. CONSTRUCTION $19,245 <br />+10% CONTINGENCIES $1,925 <br />$21,170 <br />+30% OTHER DIRECT COSTS $6,351 <br />TOTAL SERVICE COST $27,520 <br />TOTAL PROJECT COST $138,094 <br />Page 15 <br />