Laserfiche WebLink
OPTION 2B - FORCE MAIN TO MCWS MANHOLE <br />ITEM <br />LATERAL LINE <br />Traffic control <br />Connect to ex. MH and reshape invert <br />2" HDPE force main <br />Mechanical trench compaction <br />Fiberglass cleanout structure <br />Seed w /mulch, fertilizer & 4" topsoil <br />FRATTALONE SERVICE <br />Traffic control <br />Remove bituminous surface <br />Remove concrete curb and gutter <br />Class 5 aggregate <br />2331 bituminous base <br />2341 bituminous base <br />Tack <br />2" HDPE force main <br />Cross existing water main <br />Mechanical trench compaction <br />2" HDPE service fitting <br />Seed w /mulch, fertilizer & 4 "-topsoil <br />UNIT <br />UNIT QUANTITY COST <br />L.S. <br />Ea. <br />L.F. <br />L.F. <br />Ea. <br />Ac. <br />1 <br />1 <br />310 <br />310 <br />2 <br />0.75 <br />$500.00 <br />$1,000.00 <br />$25.00 <br />$2.00 <br />$3,000.00 <br />$1,500.00 <br />TOTAL EST. CONSTRUC'12ON <br />+10% CONTINGENCIES <br />+30% OTHER DIRECT COSTS <br />+ EASEMENTS <br />TOTAL LATERAL COST <br />L.S. <br />S.Y. <br />L.F. <br />Ton <br />Ton <br />Ton <br />Gal <br />L.F. <br />L.S. <br />L.F. <br />Ea. <br />Ac. <br />1 $1,000.00 <br />100 $3.00 <br />50 $4.00 <br />80 $10.00 <br />13 $55.00 <br />13 $55.00 <br />5 $2.00 <br />80 $25.00 <br />1 $300.00 <br />80 $2.00 <br />1 $50.00 <br />0.3 $1,500.00 <br />TOTAL EST. CONSTRUCTION <br />+10% CONTINGENCIES <br />+30% OTHER DIRECT COSTS <br />TOTAL SERVICE COST <br />TOTAL PROJECT COST <br />Page 17 <br />COST <br />$500 <br />$1,000 <br />$7,750 <br />$620 <br />$6,000 <br />$1,125 <br />$16,995 <br />$1,700 <br />$18,695 <br />$5,608 <br />$3,000 <br />$27,303 <br />$1,000 <br />$300 <br />$200 <br />$800 <br />$715 <br />$715 <br />$10 <br />$2,000 <br />$300 <br />$160 <br />$50 <br />$375 <br />$6,625 <br />$663 <br />$7,288 <br />$2,186 <br />$9,474 <br />$36,777 <br />