My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-09-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
04-09-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2014 3:55:40 PM
Creation date
4/4/2014 3:55:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT #2 <br />James Steele Construction Company <br />Project: New Public Works - Parks Facility <br />Owner: City of Little Canada <br />Architect: Oertel Architects <br />Preliminary Master Budget <br />Date: 04/04/14 <br />Estimate: SD1 <br />Estimator: TPC <br />Project SF: 26,500 <br />Duration in Months: 8 <br />General Building Construction Cost <br />3,600,000 <br />Value Engineering Cost Reductions <br />(372,000) <br />CM Fee: Construction Management Fee <br />3.50% <br />139,020 <br />Owner /Construction Contingency <br />7% <br />278,040 <br />Design Fees: Architectural* <br />5.85% <br />232,362 <br />Civil Engineering <br />Estimate <br />20,000 <br />Site Survey /soil borings <br />Estimate <br />10,000 <br />Material Testing & Inspection: <br />Special Inspections <br />Estimate <br />10,000 <br />Utility Related Fees: <br />Gas & Electric Service Fee <br />Estimate <br />20,000 <br />SAC Chages <br />Estimate <br />14,000 <br />Data cabling & connection Fees Estimate <br />10,000 <br />Hazardous Materials Testing & Removal: <br />Asbestos <br />Estimate <br />10,000 <br />Underground Tanks <br />Estimate <br />5,000 <br />Soil Contamination <br />Estimate <br />15,000 <br />Other Items: <br />Furniture /Equipment ** <br />Funded Elsewhere <br />Security System <br />25,000 <br />Master Budget <br />$4,016,422 <br />Less: Bond Proceeds <br />Funds Needed <br />$3,400,000 <br />$616,422 <br />* Architect's Fee is estimated at 5.85 % of construction. This % should drop given the higher construction costs <br />Equipment Needed, but not included above includes monorail, vehicle lifts, tube system, and office equipmen <br />Estimated cost for equipment is $135,000. Furnishings are estimated at $25,000. <br />Land at $675,000 is not included in the above amounts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.