Laserfiche WebLink
',NTH, <br />ARC I 11(11:,L <br />I,C LS <br />LOBBY WAITING AREA- ROOM 101 & CORRIDOR 102 <br />• Replace carpet in Lobby Waiting & Corridor areas <br />with porcelain floor tile and base. <br />• Paint all hollow metal door frames/ doors in a <br />neutral / earth tone <br />• New paint scheme for walls/ soffits based on <br />preferred tile selection <br />• New rolling security shutters for the counter <br />• Provide electrical connection to new coiling <br />shutters located at service counter <br />• Exploring the possibility of relocating the drinking <br />fountain <br />• Consolidated shelving for pamphlets, literature, <br />and AV equipment with possible bench below <br />June 11th, 2014 <br />3 <br />Tile 01: Retro- Grigio 12"x 24" <br />Tile 02: Retro- Taupe 12"x 24" <br />Tile 03: Classic- Bardiglietto 12"x 24" <br />