My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
06-25-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2014 8:32:58 AM
Creation date
6/23/2014 8:26:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"vs•' <br />- <br />,., CONTRACTING <br />03 Contracting, Inc. <br />3066 Spruce Street <br />Little Canada, MN 55117 <br />Telephone: 651-365-7390 <br />FaxQuote y: Taylor <br />Quote By: Taylor Schieck <br />651365-7390 <br />Proposal Submitted To: <br />John Olson <br />Signature Lighting <br />Proposal Dale: 5130/14 <br />Project Location: <br />Little Canada MN <br />Any changes will be accompanied by a signed <br />& approved Change Order. All payments are <br />on a net 30 basis. <br />Project Description: <br />Street Lighting Installation <br />Item # 1 <br />Item Description 1 Units 1 Quantity <br />1 Total <br />1 Little Canada Street Lights LS 1 513,864.37 <br />'Price based on all plow installation. <br />'This proposal is subject to the negotiation of mutually acceptable terms and conditions. <br />This Proposal Includes: <br />'Labor, equipment, and materials (excluding poles, fixtures, and arms) to install Ieedpoint, poles, and handhote. <br />'Basic traflie control and barricades required for project. <br />This Proposal Does Not Include: <br />'Pores, arms, fixtures; to be supplied by others. <br />'Quantities in excess of those listed in "Proposal includes" <br />section. 'Any bonding, licensing, or permits for project. <br />'Location or repair of any damaged private underground utilities from system installation not located through the Gopher State One Call System. <br />'Hard/Soft surface restoration. <br />All work to be completed under the provisions of this proposal shall be done in a workmanlike manner according to standard practices. Any alterations or <br />deviations Irom the above specifications resulting in extra costs, will be executed only upon written orders, and shall result in an extra charge over and <br />above the estimated cost contained herein. All agreements are contingent upon strikes, accidents, and delays beyond the control of Q3 Contracting. The <br />above prices, specifications, and terms and conditions on the front and back of this agreement are hereby accepted. Payment will be made as outlined <br />above. <br />Proposal may be withdrawn by 03 it not accepted within 15 days. <br />Signature: <br />Name/Title: Date of Acceptance: <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.