ITEM
<br />NO.
<br />ITEM DESCRIPTION
<br />UNIT
<br />ORIGINAL CONTRACT
<br />QTY. UNIT PRICE
<br />THIS PERIOD
<br />QTY. TOTAL PRICE
<br />TOTAL TO DATE
<br />QTY. TOTAL PRICE
<br />68
<br />2531.501
<br />CONCRETE
<br />CURB & GUTTER DESIGN 8624
<br />LF
<br />5.100.00
<br />13.40 0.00
<br />50.00
<br />5267.00
<br />570,577.80
<br />69
<br />2531.507
<br />CONCRETE
<br />DRIVEWAY APRON (6" THICK)
<br />niEMEMi
<br />44.90 0.00
<br />$0.00
<br />53.241.78
<br />70
<br />EMEM
<br />CONCRETE
<br />DRIVEWAY APRON 8"THICK
<br />SY
<br />MEM.
<br />54.30 0.00
<br />50.00
<br />90.10
<br />54,892.43
<br />mSCONCRETE
<br />DRIVEWAY PAVEMENT (6" THICK)
<br />SY
<br />140.00
<br />44.90 37.00
<br />51.661.30
<br />79.70
<br />53,578.53
<br />m.
<br />CONCRETE
<br />PEDESTRIAN RAMP(6"THICK)
<br />®
<br />2,300.00
<br />5.00 52.30
<br />5261.50
<br />1656.30
<br />59,281.50
<br />73
<br />2531.618
<br />TRUNCATED DOMES
<br />SF
<br />276.00
<br />36.50 20.00
<br />5730.00
<br />__..,124.00
<br />54.526.00
<br />74
<br />2531.618
<br />1.33' WIDE COLORED CONCRETE
<br />SF
<br />1,380.00
<br />7.10 0.00
<br />50.00
<br />0.00
<br />50.00
<br />®ggigga
<br />COLORED CONCRETE
<br />SF
<br />1.050.00
<br />®' 0.00
<br />50.00
<br />0.00
<br />50.00
<br />76
<br />2540.602
<br />INSTALL MONUMENT
<br />EACH
<br />3.00
<br />IIIME3 0.00
<br />50.00
<br />0.00
<br />50.00
<br />77
<br />IIMIMI
<br />INSTALL SALVAGED BANNER POLE
<br />MOIn
<br />2,000.00 0.00
<br />$0.00
<br />0.00
<br />50.00
<br />78
<br />2540.602
<br />INSTALL SALVAGED MAILBOXES
<br />EACH
<br />14.00
<br />105.00 0.00
<br />$0.00
<br />10.00
<br />51.050.00
<br />79
<br />2540.603
<br />LANDSCAPE EDGER
<br />LF
<br />250.00
<br />10.00 143.00
<br />51,430.00
<br />14O
<br />51.430.00
<br />sI
<br />2545.602
<br />ADJUST LIGHT
<br />EACH
<br />1.00
<br />1.500.00 0.00
<br />$0.00
<br />$1,500.00
<br />81
<br />2557.603
<br />INSTALL CHAIN
<br />LINK FENCE
<br />LF
<br />160.00
<br />20.00 0.00
<br />50.00
<br />16000
<br />$3.200.00
<br />02
<br />2557.603
<br />INSTALL SPIL
<br />T RAIL FENCE
<br />LF
<br />130.004000
<br />0.00
<br />50.00
<br />155.00
<br />56.200.00
<br />83
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1.00
<br />19.425.00 0.00
<br />$0.00
<br />514,56075
<br />m
<br />2564.531
<br />F & I SIGN PANEL
<br />®
<br />250.00
<br />26.25 0.00
<br />50.00
<br />264.94
<br />56.954.68
<br />OW
<br />F & I SIGN POST
<br />011ifilall
<br />52.50 0.00
<br />$0.00
<br />53.00
<br />52,782,50
<br />mnEa
<br />SILT FENCE TYPE MACHINE SLICED
<br />MIEMIII
<br />1,500.00
<br />276.00
<br />$828.00
<br />1066.00
<br />$3,198.00
<br />IMMO
<br />REMOVAL BACKHOE
<br />HR
<br />30.00
<br />MC 0.00
<br />$0.00
<br />0.0D
<br />50.00
<br />II
<br />®INLET
<br />PROTECTION WIMCO
<br />MEEMMMEMIE
<br />200.00 14.00
<br />$2,800.00
<br />43.00
<br />58,600.00
<br />INLET PROTECTION (STRUCTURE W/0 CASTING)
<br />EACH
<br />17.00
<br />150.00 0.00
<br />50.00
<br />73.00
<br />$1.950.00
<br />n2573.53
<br />2573.602
<br />INLET SEDIMENT REMOVAL
<br />EACH
<br />54.00
<br />75.00 16.00
<br />51,350.00
<br />21.00
<br />51,575.00
<br />ROCK CHECK DAM
<br />200.00
<br />50.00 0.00
<br />$0.00
<br />{ I
<br />MROADWAY
<br />�
<br />SODDING TYPE SALT RESISTANT
<br />SY
<br />7,700.00
<br />3.25 0.00
<br />$0.00
<br />0,00
<br />$0.00
<br />93
<br />®
<br />MULCH MATERIAL TYPE SPECIAL
<br />CY
<br />75.00
<br />40.00 II
<br />52080.00
<br />52.00
<br />52,080.00
<br />94
<br />®EROSION
<br />CONTROL BLANKET CATEGORY 6
<br />SY
<br />480.00
<br />1.95 0.00
<br />50.00
<br />450.00
<br />I I
<br />95
<br />MEMEll
<br />COMPOST GRADE 2 (SPECIAL)
<br />SY
<br />650.00
<br />10.00 235.00
<br />52.350.00
<br />235.00
<br />52.350.00
<br />OC
<br />SEEDING (TYPE 270
<br />SY
<br />480.00
<br />® 0.00
<br />$0.00
<br />450.00
<br />PAVT MSSG (LT-THRU SYMBOL) EPDXY
<br />EACH
<br />3.00
<br />183.00 0.00
<br />50.00
<br />000
<br />$0.00
<br />II2542501
<br />258?..501
<br />PAVT MSSG RT TURN SYMBOL EPDXY
<br />EACH
<br />4.00
<br />130.00 0.00
<br />$0.00
<br />0.00
<br />50.00
<br />fl4"
<br />SOLID LINE WHITE - EPDXY
<br />LF
<br />6,600.00
<br />0.24 0.00
<br />50.00
<br />0.00
<br />$0.00
<br />II
<br />4" BROKEN LINE WHITE -EPDXY
<br />LF
<br />300.00
<br />0.24 0.00
<br />50.00
<br />0.00
<br />$0.00
<br />101
<br />MEM
<br />4" STOP LINE. WHITE - EPDXY
<br />LF
<br />155.00
<br />8.40 0.00
<br />50.00
<br />0.00
<br />$0.00
<br />102
<br />2582.502
<br />K' DOUBLE SOLID LINE YELLOW - EPDXY
<br />LF
<br />6.450.00
<br />0.46 0.00
<br />50.00
<br />0.00
<br />$0.00
<br />103
<br />2582.503
<br />CROSSWALK MARKING • EPDXY
<br />SF
<br />710.00
<br />4,70 0.00
<br />50.00
<br />0.00
<br />$0.00
<br />SCHEDULE 1.0- LITTLE CANADA ROAD --TOTAL 520,091.75 5817.835.37
<br />ALTERNATE 1.0 • LITTLE CANADA ROAD ALTERNATE
<br />1
<br />2104.509
<br />REMOVE HYDRANT AND VALVE
<br />EACH
<br />1.00
<br />1890.04 0.00
<br />$0.00
<br />1.00
<br />51 890.00
<br />2
<br />2411618
<br />BLOCK RETAINING WALL SPECIAL (WET CAST)
<br />SF
<br />600.00
<br />36.001 0.00
<br />50.00
<br />385.25
<br />513.869.00
<br />3
<br />2504.602
<br />INSTALL HYDRANT AND VALVE
<br />EACH
<br />1.00
<br />6,225.00
<br />0.00
<br />50,00
<br />1.00
<br />56,225.00
<br />4
<br />2504.602
<br />ADJUST VALVE
<br />EACH
<br />1.00
<br />345.00
<br />0.00
<br />50.00
<br />1.00
<br />5345.00
<br />5
<br />2521.501
<br />4" CONCRETE SIDEWALK
<br />SF
<br />1.080.00
<br />3.10
<br />0.00
<br />50.00
<br />957.00
<br />52.966.70
<br />6
<br />2557.603
<br />INSTALL SPLIT RAIL FENCE
<br />LF
<br />125.00
<br />40.00
<br />0.00
<br />50.00
<br />125.00
<br />55,000.OD
<br />ALTERNATE 1.0 • LITTLE CANADA ROAD-- TOTAL 50.00 530,295.70
<br />SCHEDULE 2.0- CHANGE ORDERS
<br />1
<br />SPEC
<br />CHANGE ORDER Al (5551C ROAD SERVICES)
<br />LS
<br />1.00
<br />10.896.00
<br />0.00
<br />50.00
<br />1.00
<br />510,896.00
<br />2
<br />SPEC
<br />CHANGE ORDER /12
<br />LS
<br />1.00
<br />13,362.79
<br />0.00
<br />50.00
<br />1.00
<br />513,362.79
<br />3
<br />SPEC
<br />CHANGE ORDER 43
<br />LS
<br />1.00
<br />2.8,015.38
<br />0.00
<br />50.00
<br />1.00
<br />528,015.36
<br />SCHEDULE 2.0 • CHANGE ORDERS -. TOTAL 50.00 552.274.17
<br />SCHEDULE 3.0 - SUPPLEMENTAL 41 SIDEWALK ADDITION
<br />1
<br />2021,501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />$7000.00
<br />090
<br />53.500.00
<br />0.50
<br />53,500,00
<br />2
<br />2101.502
<br />CLEAR
<br />TREE
<br />4,00
<br />$350.00
<br />4.00
<br />51,400.00
<br />4.00
<br />51.400.00
<br />3
<br />2101.507
<br />GRUB
<br />TREE
<br />5.00
<br />$250.00
<br />5.00
<br />$1,250.00
<br />5.00
<br />51.250.00
<br />4
<br />2104.501
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LF
<br />145.00
<br />512.00
<br />351.00
<br />54,212.00
<br />351.00
<br />54.212.00
<br />5
<br />2104.503
<br />SALVAGE RETAINING WALL
<br />SF
<br />40.00
<br />516.00
<br />12.30
<br />$196.80
<br />12.30
<br />5196.80
<br />6
<br />2104.505
<br />REMOVE
<br />CONCRETE PAVEMENT
<br />5Y
<br />165.00
<br />57.50
<br />200.00
<br />51,500.00
<br />200.00
<br />51,500.00
<br />7
<br />2104.505
<br />REMOVE
<br />B
<br />TUMINOUS PAVEMENT
<br />SY
<br />375.00
<br />55.65
<br />410.00
<br />52,316.50
<br />410.00
<br />$2.316.60
<br />8
<br />2104.507
<br />REMOVE
<br />PHONE
<br />BOOTH
<br />EACH
<br />1.00
<br />5325.00
<br />1.00
<br />5325.00
<br />1.00
<br />5325.00
<br />9
<br />2104507
<br />REMOVE
<br />$
<br />GN BASE
<br />EACH
<br />1.00
<br />5110.00
<br />1.00
<br />5110.00
<br />1.00
<br />5110.00
<br />10
<br />2104,511
<br />SAW CUT CONCRETE (FULL DEPTH)
<br />lF
<br />72.00
<br />$2.65
<br />336.00
<br />5890.40
<br />336.00
<br />5890.40
<br />71
<br />2104.513
<br />SAW CUT BITUMINOUS (FULL DEPTH)
<br />LP
<br />250.00
<br />$2.35
<br />758.00
<br />$1.781.30
<br />758.00
<br />51,781.30
<br />12
<br />2104.523
<br />SALVAGE SIGN
<br />EACH
<br />3.00
<br />526.00
<br />6.00
<br />5156.00
<br />6.00
<br />5156.00
<br />13
<br />2104.523
<br />SALVAGE MAILBOX
<br />EACH
<br />13.00
<br />536.75
<br />0.00
<br />50.00
<br />0.00
<br />50.00
<br />14
<br />2105,523
<br />SALVAGE LIGHT
<br />EACH
<br />1.00
<br />5650.00
<br />1.00
<br />$650.00
<br />1.00
<br />$650.00
<br />15
<br />2105.501
<br />COMMON EXCAVATION (P)
<br />CY
<br />250.00
<br />$30.00
<br />215.00
<br />56,450.00
<br />215.00
<br />$6,450.00
<br />16
<br />2105.525
<br />TOP SOIL BORROW (CV 41111111111111011111
<br />6050.00
<br />0.00
<br />$0.00
<br />17
<br />2211.501
<br />AGGREGATE BASE, CLASS 5
<br />TON
<br />244.00
<br />519.50
<br />126.28
<br />$2.462.46
<br />126.28
<br />52,462.46
<br />18
<br />2350.501
<br />TYPE SPWE8340C WEARING COURSE MIX(DRIVEWAYL
<br />'10N
<br />42.00
<br />$150.00
<br />46.47
<br />$6.970.50
<br />46.47
<br />56.970.50
<br />19
<br />2521.501
<br />4" CONCRETE SIDEWALK
<br />SF
<br />3,060.00
<br />52.90
<br />3228.00
<br />59,361.20
<br />3228.00
<br />59.361.20
<br />20
<br />2531,501
<br />CONCRETE CURB&GUTTER8612
<br />LF
<br />100.00
<br />519.70
<br />26.00
<br />5512.20
<br />26,00
<br />$512.20
<br />21
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN 8624
<br />LF
<br />65.00
<br />519.70
<br />218.50
<br />54,304.45
<br />218.50
<br />54,304.45
<br />22
<br />2631.507
<br />CONCRETE DRIVEWAY PAVEMENT (6" THICK)
<br />SY
<br />185.00
<br />544.90
<br />78.70
<br />53,533.63
<br />78.70
<br />53,533.63
<br />23
<br />2531.507
<br />CONCRETE DRIVEWAY PAVEMENT (8" THICK)
<br />SY
<br />110.00
<br />554,30
<br />151.40
<br />58,221.02
<br />151.40
<br />58,221.02
<br />24
<br />2531.602
<br />CONCRETE PEDESTRIAN RAMP (6" THICK)
<br />SF
<br />350.00
<br />55.00
<br />42.00
<br />5210.00
<br />42.00
<br />5210.00
<br />25
<br />2531.618
<br />TRUNCATED DOMES
<br />SF
<br />8.00
<br />$36.50
<br />0.00
<br />$0.00
<br />0.00
<br />50.00
<br />26
<br />2540.602
<br />INSTALL MONUMENT
<br />EACH
<br />1.00
<br />51.125.00
<br />0.00
<br />50.00
<br />0,00
<br />50.00
<br />
|