Laserfiche WebLink
ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />68 <br />2531.501 <br />CONCRETE <br />CURB & GUTTER DESIGN 8624 <br />LF <br />5.100.00 <br />13.40 0.00 <br />50.00 <br />5267.00 <br />570,577.80 <br />69 <br />2531.507 <br />CONCRETE <br />DRIVEWAY APRON (6" THICK) <br />niEMEMi <br />44.90 0.00 <br />$0.00 <br />53.241.78 <br />70 <br />EMEM <br />CONCRETE <br />DRIVEWAY APRON 8"THICK <br />SY <br />MEM. <br />54.30 0.00 <br />50.00 <br />90.10 <br />54,892.43 <br />mSCONCRETE <br />DRIVEWAY PAVEMENT (6" THICK) <br />SY <br />140.00 <br />44.90 37.00 <br />51.661.30 <br />79.70 <br />53,578.53 <br />m. <br />CONCRETE <br />PEDESTRIAN RAMP(6"THICK) <br />® <br />2,300.00 <br />5.00 52.30 <br />5261.50 <br />1656.30 <br />59,281.50 <br />73 <br />2531.618 <br />TRUNCATED DOMES <br />SF <br />276.00 <br />36.50 20.00 <br />5730.00 <br />__..,124.00 <br />54.526.00 <br />74 <br />2531.618 <br />1.33' WIDE COLORED CONCRETE <br />SF <br />1,380.00 <br />7.10 0.00 <br />50.00 <br />0.00 <br />50.00 <br />®ggigga <br />COLORED CONCRETE <br />SF <br />1.050.00 <br />®' 0.00 <br />50.00 <br />0.00 <br />50.00 <br />76 <br />2540.602 <br />INSTALL MONUMENT <br />EACH <br />3.00 <br />IIIME3 0.00 <br />50.00 <br />0.00 <br />50.00 <br />77 <br />IIMIMI <br />INSTALL SALVAGED BANNER POLE <br />MOIn <br />2,000.00 0.00 <br />$0.00 <br />0.00 <br />50.00 <br />78 <br />2540.602 <br />INSTALL SALVAGED MAILBOXES <br />EACH <br />14.00 <br />105.00 0.00 <br />$0.00 <br />10.00 <br />51.050.00 <br />79 <br />2540.603 <br />LANDSCAPE EDGER <br />LF <br />250.00 <br />10.00 143.00 <br />51,430.00 <br />14O <br />51.430.00 <br />sI <br />2545.602 <br />ADJUST LIGHT <br />EACH <br />1.00 <br />1.500.00 0.00 <br />$0.00 <br />$1,500.00 <br />81 <br />2557.603 <br />INSTALL CHAIN <br />LINK FENCE <br />LF <br />160.00 <br />20.00 0.00 <br />50.00 <br />16000 <br />$3.200.00 <br />02 <br />2557.603 <br />INSTALL SPIL <br />T RAIL FENCE <br />LF <br />130.004000 <br />0.00 <br />50.00 <br />155.00 <br />56.200.00 <br />83 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />19.425.00 0.00 <br />$0.00 <br />514,56075 <br />m <br />2564.531 <br />F & I SIGN PANEL <br />® <br />250.00 <br />26.25 0.00 <br />50.00 <br />264.94 <br />56.954.68 <br />OW <br />F & I SIGN POST <br />011ifilall <br />52.50 0.00 <br />$0.00 <br />53.00 <br />52,782,50 <br />mnEa <br />SILT FENCE TYPE MACHINE SLICED <br />MIEMIII <br />1,500.00 <br />276.00 <br />$828.00 <br />1066.00 <br />$3,198.00 <br />IMMO <br />REMOVAL BACKHOE <br />HR <br />30.00 <br />MC 0.00 <br />$0.00 <br />0.0D <br />50.00 <br />II <br />®INLET <br />PROTECTION WIMCO <br />MEEMMMEMIE <br />200.00 14.00 <br />$2,800.00 <br />43.00 <br />58,600.00 <br />INLET PROTECTION (STRUCTURE W/0 CASTING) <br />EACH <br />17.00 <br />150.00 0.00 <br />50.00 <br />73.00 <br />$1.950.00 <br />n2573.53 <br />2573.602 <br />INLET SEDIMENT REMOVAL <br />EACH <br />54.00 <br />75.00 16.00 <br />51,350.00 <br />21.00 <br />51,575.00 <br />ROCK CHECK DAM <br />200.00 <br />50.00 0.00 <br />$0.00 <br />{ I <br />MROADWAY <br />� <br />SODDING TYPE SALT RESISTANT <br />SY <br />7,700.00 <br />3.25 0.00 <br />$0.00 <br />0,00 <br />$0.00 <br />93 <br />® <br />MULCH MATERIAL TYPE SPECIAL <br />CY <br />75.00 <br />40.00 II <br />52080.00 <br />52.00 <br />52,080.00 <br />94 <br />®EROSION <br />CONTROL BLANKET CATEGORY 6 <br />SY <br />480.00 <br />1.95 0.00 <br />50.00 <br />450.00 <br />I I <br />95 <br />MEMEll <br />COMPOST GRADE 2 (SPECIAL) <br />SY <br />650.00 <br />10.00 235.00 <br />52.350.00 <br />235.00 <br />52.350.00 <br />OC <br />SEEDING (TYPE 270 <br />SY <br />480.00 <br />® 0.00 <br />$0.00 <br />450.00 <br />PAVT MSSG (LT-THRU SYMBOL) EPDXY <br />EACH <br />3.00 <br />183.00 0.00 <br />50.00 <br />000 <br />$0.00 <br />II2542501 <br />258?..501 <br />PAVT MSSG RT TURN SYMBOL EPDXY <br />EACH <br />4.00 <br />130.00 0.00 <br />$0.00 <br />0.00 <br />50.00 <br />fl4" <br />SOLID LINE WHITE - EPDXY <br />LF <br />6,600.00 <br />0.24 0.00 <br />50.00 <br />0.00 <br />$0.00 <br />II <br />4" BROKEN LINE WHITE -EPDXY <br />LF <br />300.00 <br />0.24 0.00 <br />50.00 <br />0.00 <br />$0.00 <br />101 <br />MEM <br />4" STOP LINE. WHITE - EPDXY <br />LF <br />155.00 <br />8.40 0.00 <br />50.00 <br />0.00 <br />$0.00 <br />102 <br />2582.502 <br />K' DOUBLE SOLID LINE YELLOW - EPDXY <br />LF <br />6.450.00 <br />0.46 0.00 <br />50.00 <br />0.00 <br />$0.00 <br />103 <br />2582.503 <br />CROSSWALK MARKING • EPDXY <br />SF <br />710.00 <br />4,70 0.00 <br />50.00 <br />0.00 <br />$0.00 <br />SCHEDULE 1.0- LITTLE CANADA ROAD --TOTAL 520,091.75 5817.835.37 <br />ALTERNATE 1.0 • LITTLE CANADA ROAD ALTERNATE <br />1 <br />2104.509 <br />REMOVE HYDRANT AND VALVE <br />EACH <br />1.00 <br />1890.04 0.00 <br />$0.00 <br />1.00 <br />51 890.00 <br />2 <br />2411618 <br />BLOCK RETAINING WALL SPECIAL (WET CAST) <br />SF <br />600.00 <br />36.001 0.00 <br />50.00 <br />385.25 <br />513.869.00 <br />3 <br />2504.602 <br />INSTALL HYDRANT AND VALVE <br />EACH <br />1.00 <br />6,225.00 <br />0.00 <br />50,00 <br />1.00 <br />56,225.00 <br />4 <br />2504.602 <br />ADJUST VALVE <br />EACH <br />1.00 <br />345.00 <br />0.00 <br />50.00 <br />1.00 <br />5345.00 <br />5 <br />2521.501 <br />4" CONCRETE SIDEWALK <br />SF <br />1.080.00 <br />3.10 <br />0.00 <br />50.00 <br />957.00 <br />52.966.70 <br />6 <br />2557.603 <br />INSTALL SPLIT RAIL FENCE <br />LF <br />125.00 <br />40.00 <br />0.00 <br />50.00 <br />125.00 <br />55,000.OD <br />ALTERNATE 1.0 • LITTLE CANADA ROAD-- TOTAL 50.00 530,295.70 <br />SCHEDULE 2.0- CHANGE ORDERS <br />1 <br />SPEC <br />CHANGE ORDER Al (5551C ROAD SERVICES) <br />LS <br />1.00 <br />10.896.00 <br />0.00 <br />50.00 <br />1.00 <br />510,896.00 <br />2 <br />SPEC <br />CHANGE ORDER /12 <br />LS <br />1.00 <br />13,362.79 <br />0.00 <br />50.00 <br />1.00 <br />513,362.79 <br />3 <br />SPEC <br />CHANGE ORDER 43 <br />LS <br />1.00 <br />2.8,015.38 <br />0.00 <br />50.00 <br />1.00 <br />528,015.36 <br />SCHEDULE 2.0 • CHANGE ORDERS -. TOTAL 50.00 552.274.17 <br />SCHEDULE 3.0 - SUPPLEMENTAL 41 SIDEWALK ADDITION <br />1 <br />2021,501 <br />MOBILIZATION <br />LS <br />1.00 <br />$7000.00 <br />090 <br />53.500.00 <br />0.50 <br />53,500,00 <br />2 <br />2101.502 <br />CLEAR <br />TREE <br />4,00 <br />$350.00 <br />4.00 <br />51,400.00 <br />4.00 <br />51.400.00 <br />3 <br />2101.507 <br />GRUB <br />TREE <br />5.00 <br />$250.00 <br />5.00 <br />$1,250.00 <br />5.00 <br />51.250.00 <br />4 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LF <br />145.00 <br />512.00 <br />351.00 <br />54,212.00 <br />351.00 <br />54.212.00 <br />5 <br />2104.503 <br />SALVAGE RETAINING WALL <br />SF <br />40.00 <br />516.00 <br />12.30 <br />$196.80 <br />12.30 <br />5196.80 <br />6 <br />2104.505 <br />REMOVE <br />CONCRETE PAVEMENT <br />5Y <br />165.00 <br />57.50 <br />200.00 <br />51,500.00 <br />200.00 <br />51,500.00 <br />7 <br />2104.505 <br />REMOVE <br />B <br />TUMINOUS PAVEMENT <br />SY <br />375.00 <br />55.65 <br />410.00 <br />52,316.50 <br />410.00 <br />$2.316.60 <br />8 <br />2104.507 <br />REMOVE <br />PHONE <br />BOOTH <br />EACH <br />1.00 <br />5325.00 <br />1.00 <br />5325.00 <br />1.00 <br />5325.00 <br />9 <br />2104507 <br />REMOVE <br />$ <br />GN BASE <br />EACH <br />1.00 <br />5110.00 <br />1.00 <br />5110.00 <br />1.00 <br />5110.00 <br />10 <br />2104,511 <br />SAW CUT CONCRETE (FULL DEPTH) <br />lF <br />72.00 <br />$2.65 <br />336.00 <br />5890.40 <br />336.00 <br />5890.40 <br />71 <br />2104.513 <br />SAW CUT BITUMINOUS (FULL DEPTH) <br />LP <br />250.00 <br />$2.35 <br />758.00 <br />$1.781.30 <br />758.00 <br />51,781.30 <br />12 <br />2104.523 <br />SALVAGE SIGN <br />EACH <br />3.00 <br />526.00 <br />6.00 <br />5156.00 <br />6.00 <br />5156.00 <br />13 <br />2104.523 <br />SALVAGE MAILBOX <br />EACH <br />13.00 <br />536.75 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />14 <br />2105,523 <br />SALVAGE LIGHT <br />EACH <br />1.00 <br />5650.00 <br />1.00 <br />$650.00 <br />1.00 <br />$650.00 <br />15 <br />2105.501 <br />COMMON EXCAVATION (P) <br />CY <br />250.00 <br />$30.00 <br />215.00 <br />56,450.00 <br />215.00 <br />$6,450.00 <br />16 <br />2105.525 <br />TOP SOIL BORROW (CV 41111111111111011111 <br />6050.00 <br />0.00 <br />$0.00 <br />17 <br />2211.501 <br />AGGREGATE BASE, CLASS 5 <br />TON <br />244.00 <br />519.50 <br />126.28 <br />$2.462.46 <br />126.28 <br />52,462.46 <br />18 <br />2350.501 <br />TYPE SPWE8340C WEARING COURSE MIX(DRIVEWAYL <br />'10N <br />42.00 <br />$150.00 <br />46.47 <br />$6.970.50 <br />46.47 <br />56.970.50 <br />19 <br />2521.501 <br />4" CONCRETE SIDEWALK <br />SF <br />3,060.00 <br />52.90 <br />3228.00 <br />59,361.20 <br />3228.00 <br />59.361.20 <br />20 <br />2531,501 <br />CONCRETE CURB&GUTTER8612 <br />LF <br />100.00 <br />519.70 <br />26.00 <br />5512.20 <br />26,00 <br />$512.20 <br />21 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN 8624 <br />LF <br />65.00 <br />519.70 <br />218.50 <br />54,304.45 <br />218.50 <br />54,304.45 <br />22 <br />2631.507 <br />CONCRETE DRIVEWAY PAVEMENT (6" THICK) <br />SY <br />185.00 <br />544.90 <br />78.70 <br />53,533.63 <br />78.70 <br />53,533.63 <br />23 <br />2531.507 <br />CONCRETE DRIVEWAY PAVEMENT (8" THICK) <br />SY <br />110.00 <br />554,30 <br />151.40 <br />58,221.02 <br />151.40 <br />58,221.02 <br />24 <br />2531.602 <br />CONCRETE PEDESTRIAN RAMP (6" THICK) <br />SF <br />350.00 <br />55.00 <br />42.00 <br />5210.00 <br />42.00 <br />5210.00 <br />25 <br />2531.618 <br />TRUNCATED DOMES <br />SF <br />8.00 <br />$36.50 <br />0.00 <br />$0.00 <br />0.00 <br />50.00 <br />26 <br />2540.602 <br />INSTALL MONUMENT <br />EACH <br />1.00 <br />51.125.00 <br />0.00 <br />50.00 <br />0,00 <br />50.00 <br />