My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2014 Planning Comm. Agenda
>
Agenda Packets
>
2010-2019
>
2014
>
08-14-2014 Planning Comm. Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2014 12:51:47 PM
Creation date
8/8/2014 12:50:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fra -Dor, Inc. <br />Aggregate Stockpiling and Recycling Interim Use Permit <br />Interim Use Agreement <br />Page 6 of 19 <br />Permitted Activity <br />14. Subject to compliance with the terms of this Agreement, the Owner shall be <br />permitted to operate storage, stockpiling, and processing (crushing) of aggregate materials and <br />other activities relating to the same for the purpose of making recycled concrete and asphalt <br />aggregate, as well as the storage, stockpiling and processing of topsoil (black dirt), as an interim <br />use in an I-2 District. <br />15. The site shall be improved and maintained per the approved Site Development Plan <br />on file with the City, which shall include but not be limited to the Owner paving the roadway <br />access area, paving and striping parking areas, installing and maintaining perimeter concrete <br />curbing around parking areas, limiting the usage of the west entrance onto Ryan Drive, limiting <br />the height of stockpiled materials, controlling dust, and providing adequate berming and <br />landscaping of the operation as approved by City staff. <br />16. Owner shall comply with the approved erosion control plan for the prevention of <br />damage to adjacent property and the control of surface water runoff. As the operation continues, <br />the City may impose additional erosion control requirements if, in the opinion of the City <br />Engineer, they would be useful. Owner shall comply with the erosion control plans. <br />17. Owner shall promptly clear any soil, earth or debris resulting from work by Owner <br />or of its customers, agents or assigns. Owner's responsibilities shall also include sweeping <br />public streets in the vicinity of the interim use operation to remove any debris tracked from the <br />site onto the public streets. Owner shall constantly monitor conditions and sweep as needed or <br />within 24 hours notice by City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.