17861
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN 8624
<br />ORIGINAL CONTRACT
<br />THIS PERIOD
<br />TOTAL TO DATE
<br />NO.
<br />ITEM DESCRIPTION
<br />UNIT
<br />QTY. UNIT PRICE
<br />QTY. TOTAL PRICE
<br />QTY. TOTAL PRICE
<br />68
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN 8624
<br />LF
<br />5,100.00
<br />13.40
<br />3.00
<br />$40.20
<br />527000
<br />$70,618.00
<br />69
<br />2531.507
<br />CONCRETE DRIVEWAY APRON
<br />(6" THICK)
<br />(8" THICK)
<br />SY
<br />SY
<br />65.00
<br />65.00
<br />44.90
<br />54.30
<br />0.00
<br />0.00
<br />30.00
<br />$0.00
<br />72.20
<br />90.10
<br />$3.241.78
<br />34,892.43
<br />70
<br />2531.507
<br />CONCRETE DRIVEWAY APRON
<br />71
<br />2531.507
<br />CONCRETE DRIVEWAY PAVEMENT
<br />CONCRETE PEDESTRIAN RAMP
<br />(6 THICK)
<br />(6" THICK)
<br />SY
<br />SP
<br />SY
<br />140.00
<br />2,300.00
<br />276.00
<br />44.90
<br />5.00
<br />36,50
<br />0.00
<br />0.00
<br />8.00
<br />50.00
<br />$0.00
<br />3292.00
<br />79.70
<br />1856.30
<br />132.00
<br />33,578.53
<br />$9,201.50
<br />54,818.00
<br />72
<br />2531.602
<br />73
<br />2531.618
<br />TRUNCATED DOMES
<br />74
<br />2531,618
<br />1.33' WIDE COLORED CONCRETE
<br />SF
<br />1,380.00
<br />7.10
<br />1697.00
<br />312,048.70
<br />1697.00
<br />$12,048.70
<br />75
<br />2531.618
<br />COLORED CONCRETE
<br />SF
<br />1,050.00
<br />7.10
<br />1126.00
<br />37,994.60
<br />1126.00
<br />37,994.60
<br />76
<br />2540.602
<br />INSTALL MONUMENT
<br />EACH
<br />3.00
<br />735,00
<br />0.00
<br />30.00
<br />0.00
<br />$0.00
<br />77
<br />2540.602
<br />INSTALL SALVAGED BANNER POLE
<br />EACH
<br />2.00
<br />2,000.00
<br />0.00
<br />30.00
<br />0.00
<br />$0.00
<br />78
<br />2540.602
<br />INSTALL SALVAGED MAILBOXES
<br />EACH
<br />14.00
<br />105.00
<br />0.00
<br />$0.00
<br />10.00
<br />31,050.00
<br />79
<br />2540.603
<br />LANDSCAPE EDGER
<br />LF
<br />250.00
<br />10.00
<br />0.00
<br />30.00
<br />143.00
<br />$1,430,00
<br />80
<br />2545.602
<br />ADJUST LIGHT
<br />EACH
<br />1.00
<br />1,500.00
<br />0.00
<br />30.00
<br />1.00
<br />31,500.00
<br />81
<br />2557.603
<br />INSTALL CHAIN LINK FENCE
<br />LF
<br />160.00
<br />20.00
<br />0.00
<br />30.00
<br />160.00
<br />33,200.00
<br />82
<br />2557.603
<br />INSTALL SPLIT RAIL FENCE
<br />LF
<br />130.00
<br />40.00
<br />0.00
<br />$0.00
<br />155.00
<br />36,200.00
<br />83
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1.00
<br />19,425.00
<br />0.00
<br />30.00
<br />0.75
<br />514,568.75
<br />84
<br />2564,531
<br />F & I SIGN PANEL
<br />SF
<br />250.00
<br />26.25
<br />-96.81
<br />-82,541.26
<br />168.13
<br />54,413.41
<br />85
<br />2564 602
<br />F & I SIGN POST
<br />EACH
<br />LF
<br />47.00
<br />1,500.00
<br />52.50
<br />3.00
<br />-25.00
<br />-321.00
<br />-31,312.50
<br />-3983.00
<br />28.00
<br />745.00
<br />$1,470.00
<br />32,235.00
<br />86
<br />2573.502
<br />SILT FENCE TYPE MACHINE SLICED
<br />87
<br />2573.52
<br />SEDIMENT REMOVAL BACKHOE
<br />HR
<br />30.00
<br />175.00
<br />0.00
<br />50.00
<br />0.00
<br />$0.00
<br />88
<br />2573.53
<br />INLET PROTECTION (WIMCO)
<br />EACH
<br />4" CONCRETE SIDEWALK
<br />CONCRETE CURB & GUTTER 0612
<br />CONCRETE CURB & GUTTER DESIGN 8624
<br />21.00
<br />200.00
<br />0,00
<br />$0.00
<br />43.00
<br />38,600.00
<br />89
<br />2573.53
<br />2573.602
<br />INLET PROTECTION (STRUCTURE W/0 CASTING)
<br />INLET SEDIMENT REMOVAL
<br />EACH
<br />EACH
<br />2531.501
<br />17.00
<br />54.00
<br />160.00
<br />75.00
<br />0.00
<br />0.00
<br />50.00
<br />$0.00
<br />13.00
<br />21.00
<br />31,950.00
<br />$1.575,00
<br />90
<br />91
<br />2573.607
<br />ROADWAY ROCK CHECK DAM
<br />CY
<br />200.00
<br />50.00
<br />0.00
<br />30.00
<br />26.65
<br />31,332.50
<br />92
<br />2575.505
<br />SODDING TYPE SALT RESISTANT
<br />SY
<br />7,700.00
<br />3.25
<br />5154,50
<br />316.752.13
<br />5154.50
<br />316,752.13
<br />93
<br />2575.513
<br />MULCH MATERIAL TYPE SPECIAL
<br />CY
<br />75.00
<br />40.00
<br />0.00
<br />$0.00
<br />52.00
<br />32,080.00
<br />94
<br />2575.523
<br />EROSION CONTROL BLANKET (CATEGORY 6)
<br />SY
<br />480.00
<br />1.95
<br />0.00
<br />30,00
<br />450.00
<br />3877.50
<br />95
<br />2575.604
<br />COMPOST GRADE 2
<br />SY
<br />SY
<br />650.00
<br />480.00
<br />10.00
<br />1.25
<br />0.00
<br />300,00
<br />30.00
<br />3375.00
<br />235.00
<br />750.00
<br />52,350.00
<br />3937.50
<br />96
<br />2575.604
<br />-(SPECIAL)
<br />SEEDING (TYPE 270)
<br />97
<br />98
<br />2582 501
<br />2582 501
<br />PAVT MSSG (LT THRU SYMBOL) EPDXY
<br />EACH
<br />EACH
<br />LF
<br />3.00
<br />183,00
<br />13000
<br />0.24
<br />0.00
<br />0.00
<br />0,00
<br />$0.00
<br />30.00
<br />50.00
<br />0.00
<br />0.00
<br />0.00
<br />$0.00
<br />30.00
<br />$0.00
<br />PAVT MSSG (RT TURN SYMBOL)
<br />EPDXY
<br />4.00
<br />6,600.00
<br />99
<br />2582.502
<br />4" SOLID LINE WHITE -EPDXY
<br />100
<br />2582.502
<br />4" BROKEN LINE WHITE - EPDXY
<br />LF
<br />300.00
<br />0.24
<br />0.00
<br />30.00
<br />0.00
<br />$0.00
<br />101
<br />2582.502
<br />24" STOP LINE. WHITE - EPDXY
<br />IF
<br />155.00
<br />8.40
<br />0,00
<br />50.00
<br />0.00
<br />30.00
<br />102
<br />2582.502
<br />4" DOUBLE SOLID LINE YELLOW-EPDXY
<br />LF
<br />6,450.00
<br />0.48
<br />0.00
<br />$0.00
<br />0.00
<br />30.00
<br />103
<br />2582.503
<br />CROSSWALK MARKING -EPDXY
<br />SF
<br />710.00
<br />4.70
<br />0.00
<br />30.00
<br />0.00
<br />$0.00
<br />SCHEDULE 1,0 - LITTLE CANADA ROAD -- TOTAL --- _--- $23,099.35 5840,934.72
<br />ALTERNATE 1.0 - LITTLE CANADA ROAD ALTERNATE
<br />1
<br />2104.509
<br />REMOVE HYDRANT AND VALVE
<br />EACH
<br />1.00
<br />1,890.00
<br />0.00
<br />30.00
<br />1,00
<br />31,890,00
<br />2
<br />2411.618
<br />BLOCK RETAINING WALL SPECIAL (WET CAS)
<br />SF
<br />600.00
<br />36.00
<br />0.00
<br />50.00
<br />385.26
<br />313,869.00
<br />3
<br />2504,602
<br />INSTALL HYDRANT AND VALVE
<br />EACH
<br />1.00
<br />6,225.00
<br />0.00
<br />30.00
<br />1,00
<br />36.225.00
<br />4
<br />2504.602
<br />ADJUST VALVE
<br />EACH
<br />1.00
<br />345.00
<br />0.00
<br />30.00
<br />1.00
<br />3345,00
<br />5
<br />2521.501
<br />4" CONCRETE SIDEWALK
<br />SF
<br />1,080.00
<br />3.10
<br />212.00
<br />-$657.20
<br />745.00
<br />52,309.50
<br />6
<br />2557.603
<br />INSTALL SPLIT RAIL FENCE
<br />LF
<br />125.00
<br />40.00
<br />-12.00
<br />4480.00
<br />113.00
<br />34,520,00
<br />ALTERNATE 1.0 - LITTLE CANADA ROAD -- TOTAL -31,137.20 329,158,50
<br />SCHEDULE
<br />2.0- CHANGE ORDERS
<br />1
<br />SPEC
<br />CHANGE
<br />ORDER 41 (5551-C ROAD SERVICES)
<br />LS
<br />1.00
<br />10,896.00
<br />0.00
<br />50.00
<br />1.00
<br />510,896.00
<br />2
<br />SPEC
<br />CHANGE
<br />ORDER 02
<br />LS
<br />1.00
<br />13,362.79
<br />0.00
<br />$0.00
<br />1.00
<br />313,362.79
<br />3
<br />SPEC
<br />CHANGE
<br />ORDER #3
<br />LS
<br />1.00
<br />28,015.38
<br />0.00
<br />50.00
<br />1,00
<br />828,015.38
<br />SCHEDULE 2.0- CHANGE ORDERS -- TOTAL 30.00 552,274.17
<br />SCHEDULE 3.0 - SUPPLEMENTAL 61 SIDEWALK ADDITION
<br />1
<br />2021.501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />37,000,00
<br />0.00
<br />50.00
<br />0.50
<br />53,500.00
<br />2
<br />2101.502
<br />CLEAR
<br />TREE
<br />4.00
<br />$350.00
<br />0,00
<br />50.00
<br />4.00
<br />51,400.00
<br />3
<br />2101.507
<br />GRUB
<br />TREE
<br />5.00
<br />$250.00
<br />0.00
<br />$0.00
<br />5.00
<br />51,250.00
<br />4
<br />2104.501
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LF
<br />145.00
<br />512.00
<br />118.00
<br />$1,416.00
<br />469.00
<br />$5,628.00
<br />5
<br />2104.503
<br />SALVAGE RETAINING WALL
<br />SF
<br />40.00
<br />$16.00
<br />0.00
<br />$0.00
<br />12.30
<br />3196.80
<br />6
<br />2104.505
<br />REMOVE
<br />CONCRETE PAVEMENT
<br />SY
<br />165.00
<br />57.50
<br />20.00
<br />5150.00
<br />220.00
<br />$1,650.00
<br />7
<br />2104.505
<br />REMOVE
<br />BITUMINOUS PAVEMENT
<br />SY
<br />37500
<br />$5.65
<br />83.00
<br />$468.95
<br />493.00
<br />32,785.45
<br />8
<br />2104.507
<br />REMOVE
<br />PHONE BOOTH
<br />EACH
<br />1.00
<br />5325.00
<br />0.00
<br />50.00
<br />1.00
<br />$325.00
<br />10
<br />_ 2104,507- 2104 507_ RREMOVE
<br />2104.571
<br />SAW
<br />SIGN BASE__ _ _ _
<br />CUT CONCRETE (FULL DEPTH). -
<br />EACH
<br />LF
<br />1.00
<br />72.00
<br />5110.00
<br />52.65
<br />0_00
<br />0,00
<br />50.00
<br />$000
<br />1.00
<br />336.00
<br />5110.00
<br />5890.40
<br />11
<br />2104.513
<br />SAW CUT BITUMINOUS (FULL DEPTH)
<br />LF
<br />250.00
<br />52.35
<br />194,00
<br />3455.90
<br />952.00
<br />$2,237.20
<br />12
<br />2104.523
<br />SALVAGE SIGN
<br />EACH
<br />3.00
<br />$26.00
<br />0.00
<br />50.00
<br />6.00
<br />$156,00
<br />13
<br />2104.523
<br />SALVAGE MAILBOX
<br />EACH
<br />13.00
<br />536.75
<br />0.00
<br />50,00
<br />0.00
<br />$0.00
<br />14
<br />2105.523
<br />SALVAGE LIGHT
<br />EACH
<br />1.00
<br />5650.00
<br />0.00
<br />$0.00
<br />1.00
<br />3650.00
<br />15
<br />2105.501
<br />COMMON EXCAVATION (P)
<br />CY
<br />250.00
<br />530.00
<br />39.00
<br />31,170.00
<br />254.00
<br />57,620.00
<br />16
<br />2105.525
<br />TOP SOIL BORROW (CV)
<br />CY
<br />80.00
<br />$45.00
<br />62.25
<br />32,801.25
<br />62.25
<br />52,801,25
<br />17
<br />2211.501
<br />AGGREGATE BASE, CLASS 5
<br />TON
<br />244.00
<br />519.50
<br />46.86
<br />5913.77
<br />173.14
<br />$3 376,23
<br />18
<br />2350.501
<br />TYPE SPWEB340C WEARING COURSE MIX(DRIVEWAY)
<br />TON
<br />42,00
<br />$150.00
<br />51.86
<br />$7,779.00
<br />98.33
<br />514,749.50
<br />19
<br />2521.501
<br />4" CONCRETE SIDEWALK
<br />CONCRETE CURB & GUTTER 0612
<br />CONCRETE CURB & GUTTER DESIGN 8624
<br />SF
<br />LF
<br />LF
<br />3,060.00
<br />100.0D
<br />65.00
<br />52.90
<br />319.70
<br />$19.70
<br />660.00
<br />55.50
<br />138,50
<br />51,914.00
<br />51,093.35
<br />52.728.45
<br />3888.00
<br />81.50
<br />357,00
<br />$11,275.20
<br />51.605.55
<br />$7.032,90
<br />20
<br />2531.501
<br />21
<br />2531.501
<br />22
<br />2531.507
<br />CONCRETE DRIVEWAY PAVEMENT (6" THICK)
<br />SY
<br />185.00
<br />$44.90
<br />0.00
<br />50.00
<br />78.70
<br />53,533.63
<br />23
<br />2531.507
<br />CONCRETE DRIVEWAY PAVEMENT (8"THICK)
<br />SY
<br />110.00
<br />$54.30
<br />22.40
<br />$1,216.32
<br />173.80
<br />$9,437.34
<br />24
<br />2531.602
<br />CONCRETE PEDESTRIAN RAMP (6" THICK)
<br />SF
<br />350.00
<br />55.00
<br />56.00
<br />$280.00
<br />98.00
<br />$490.00
<br />25
<br />26
<br />2531.618
<br />2540.602
<br />TRUNCATED
<br />INSTALL
<br />DOMES
<br />SF
<br />EACH
<br />8.00
<br />1,00
<br />$36.50
<br />51,125.00
<br />12.00
<br />$438.00
<br />$0.00
<br />12.00
<br />$438.00
<br />_-,
<br />MONUMENT
<br />__.
<br />0.00
<br />0,00
<br />50.00