Laserfiche WebLink
ITEM <br />NO. <br />1 <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />0.00 <br />$0.00 <br />0.00 <br />5 <br />2504603 <br />1" TYPE K COPPER PIPE <br />LF <br />450.00 <br />528.00 <br />171.00 <br />$4,788.00 <br />171.00 <br />$4,768.0U <br />6 <br />2504.603 <br />6" DUCTILE IRON WATERMAIN CL52 <br />LF <br />45.00 <br />$39.00 <br />26.00 <br />$1,014.00 <br />26.00 <br />51.014.00 <br />7 <br />2504.603 <br />8" DUCTILE IRON WATERMAIN CL52 <br />LF <br />1.060.00 <br />$44.00 <br />1034.00 <br />$45,496.00 <br />1034.00 <br />$45,496.00 <br />6 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />LB <br />470.00 <br />58.00 <br />519.00 <br />64152.00 <br />519.00 <br />54152.00 <br />50.00 <br />6 <br />2104.501 <br />REMOVE CHAIN LINK FENCE <br />LF <br />50.00 <br />511.00 <br />0.00 <br />60.00 <br />0.00 <br />SCHEDULE 2.0- SCHLETTY WATERMAIN -- TOTAL 588,675.00 $88,675.00 <br />SCHEDULE 3.0 - WATERWORKS TRAIL CROSSING <br />1 <br />2021.501 <br />M0BILIZATION <br />LS <br />1.00 <br />$1.00 <br />0.00 <br />$0.00 <br />0.00 <br />50.00 <br />2 <br />2101.501 <br />CLEARING <br />SF <br />5,025.00 <br />51.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />3 <br />2101.502 <br />CLEAR <br />TREE <br />1.00 <br />5175.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />4 <br />2101.506 <br />GRUBBING <br />SF <br />5,025.00 <br />50.01 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />5 <br />2101.507 <br />GRUB <br />TREE <br />1.00 <br />57000 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />6 <br />2104.501 <br />REMOVE CHAIN LINK FENCE <br />LF <br />50.00 <br />511.00 <br />0.00 <br />60.00 <br />0.00 <br />50.00 <br />7 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />40.00 <br />52.75 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />8 <br />2104.523 <br />SALVAGE SIGN <br />EACH <br />1.00 <br />5210.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />9 <br />2105.501 <br />COMMON EXCAVATION (P) <br />CY <br />150.00 <br />59.50 <br />0.00 <br />60.00 <br />0.00 <br />$0,00 <br />10 <br />2105.521 <br />FILL SPECIAL (P) <br />CY <br />1,136.00 <br />58.00 <br />0.00 <br />$0.00 <br />0.00 <br />50.00 <br />11 <br />2105.604 <br />GEOTEXTILE FABRIC <br />SY <br />1,100.00 <br />52.50 <br />0.00 <br />$0.00 <br />0.00 <br />50,00 <br />12 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />700.00 <br />$19.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />13 <br />2350.501 <br />TYPE WEAR COURSE MIXTURE <br />TON <br />110.00 <br />5100.00 <br />0.00 <br />50.00 <br />0.00 <br />$0.00 <br />14 <br />2411.604 <br />MODULAR BLOCK RETAINING WALL <br />SF <br />350.00 <br />522.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />15 <br />2503.603 <br />12" DUAL WALL HOPE PIPE SEWER <br />LF <br />55.00 <br />540.00 <br />0.00 <br />50.00 <br />0.00 <br />$0,. <br />16 <br />2521.501 <br />CONCRETE PAVEMENT (6"THICK) <br />SF <br />80.00 <br />515.00 <br />0.00 <br />50.00 <br />0.00 <br />50.OU <br />17 <br />2557.603 <br />INSTALL CHAIN LINK FENCE <br />LF <br />450.00 <br />521.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />18 <br />2557.603 <br />INSTALL STEEL RAIL SAFETY FENCE <br />LF <br />187.00 <br />5140.00 <br />0.00 <br />$000 <br />0.00 <br />50.00 <br />19 <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LF <br />1,700.00 <br />52.00 <br />1000.00 <br />52.000.00 <br />1000.00 <br />52,000.00 <br />20 <br />2575.604 <br />SEEDING <br />SY <br />4,60000 <br />52.25 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />21 <br />2582.503 <br />12" X 6' VMITE STRIPE - EPDXY <br />EACH <br />2.00 <br />5110.00 <br />0,00 <br />50.00 <br />0 <br />50.00 <br />22 <br />2582.503 <br />RR CROSSING STRIPING -EPDXY <br />EACH <br />2.00 <br />5640.00 <br />0.00 <br />50.00 <br />0 <br />50.00 <br />23 <br />SPEC <br />DENSITY TEST <br />EACH <br />14.00 <br />555.00 <br />0.00 <br />50.00 <br />0 <br />50.00 <br />24 <br />SPEC <br />PROCTOR TEST <br />EACH <br />3.00 <br />5125.00 <br />0.00 <br />50.00 <br />0 <br />50.00 <br />25 <br />SPEC <br />GRADATION TEST <br />EACH <br />3.00 <br />5125.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />26 <br />SPEC <br />EXTRACTION/GRADATION <br />EACH <br />1.00 <br />5150.00 <br />0.00 <br />$0.00 <br />0.00 <br />50.00 <br />27 <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />EACH <br />3.00 <br />$180.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />SCHEDULE 3.0- WATERWORKS TRAIL CROSSING - TOTAL 52000.00 52,000.00 <br />SCHEDULE 4.0 - TRAIL REALIGNMENTS <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />51.00 <br />5000 <br />50.00 <br />0.00 <br />50.00 <br />2 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />450 <br />52.50 <br />$0.00 <br />50.00 <br />0.00 <br />50.00 <br />3 <br />2105.501 <br />COMMON EXCAVATION (P) <br />CY <br />200.00 <br />59.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />4 <br />2105.604 <br />GEOTEXTILE FABRIC <br />SY <br />735.00 <br />52.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />