Laserfiche WebLink
JAMES STEELE CONSTRUCTION <br />Price #7 — New porcelain floor and base at vestibule, lobby, hall and corridor $ 32,000 <br />Price #8 — New porcelain floors and ceramic tile walls and base in lounge and four bathrooms <br />$ 33,200 <br />Price #9 — Media center base cabinet, countertop, shelves and new countertops in lounge and <br />four bathrooms $ 19,800 <br />Price #10 — Remove and replace all cabinets in lounge per plans and specifications <br />$ 9,800 <br />Price #11- Remove existing countertop at lobby and replace with new $ 4,500 <br />Price #12 — New overhead coiling doors at lobby (non -rated) $ 8,800 <br />Price #13 -- Patch and paint all walls and flames and new wall covering per plans and <br />specifications $ 19,500 <br />Price #13A -- Scrape, skim and paint all textured ceilings <br />Price #I4 — Cover existing screen fence on L.C. Road with new cedar boards <br />If you have any questions please contact me. <br />Richard Naughton <br />President <br />James Steele Construction Company <br />1410 Sylvan Street <br />Saint Pard, Minnesota 55117 <br />(651) 488-6755 <br />Fax: (651) 488-4787 <br />j sc@jsteeleconstruction.com <br />W WW.j a 111ess teeteco nst ructi O thcom <br />$ 5,900 <br />$ 1,700 <br />Equal Opportunity Employer <br />