Laserfiche WebLink
James Steele Construction Company <br />Project: New Public Works - Parks Facility <br />Owner: City of Little Canada <br />Architect: Oertel Architects <br />Master Budget <br />Date: 09/10/14 <br />Estimate: BID <br />Estimator: TPC <br />Project SF: 25,500 <br />Duration in Months: 8 <br />General Building Construction Cost <br />3,262,128 <br />CM Fee: Construction Management Fee <br />3.50% <br />114,174 <br />Reimburseable Expenses <br />144,300 <br />Construction Contingency <br />2.00% <br />65,243 <br />Design Fees: Architectural* <br />5.85% <br />190,834 <br />Civil Engineering <br />Estimate <br />20,000 <br />Site Survey/soil borings <br />Estimate <br />10,000 <br />Material Testing & Inspection: <br />Special Inspections <br />Estimate <br />0 <br />Building Permit Surcharge <br />20 <br />Utility Related Fees: <br />Gas & Electric Service Fee <br />Estimate <br />20,000 <br />SAC Changes <br />Estimate <br />14,910 <br />Data cabling & connection Fees <br />Estimate <br />10,000 <br />Hazardous Materials Testing & Removal: <br />Asbestos <br />Estimate <br />10,000 <br />Underground Tanks <br />Estimate <br />5,000 <br />Soil Contamination <br />Estimate <br />10,000 <br />Other Items: <br />Furniture/Equipment** <br />Funded Elsewhere <br />Security System <br />25,000 <br />Builders Risk Insurance <br />Master Budget <br />$3,901,610 <br />Less: Bond Proceeds <br />Funds Needed <br />$3,400,000 <br />$501,610 <br />* Architect's Fee is estimated at 5.85 % of construction. This % should drop given the higher construction costs. <br />** Equipment Needed, but not included above includes monorail, vehicle lifts, lube system, and office equipm <br />Estimated cost for equipment is $135,000. Furnishings are estimated at $25,000. <br />Land at $675,000 is not included in the above amounts. <br />