Laserfiche WebLink
!RING liSSO(IAT S <br />DC Mil <br />Memo <br />TO: Honorable Mayor & City Council Members <br />FROM: Lee Elfering, City Engineer <br />DATE: September 18, 2014 <br />RE: Final Payment <br />Tower Valve Replacement & New Hydrant <br />Please find attached an invoice from C.W. Houle for the replacement of the water tower <br />valve and installation of a sampling hydrant on the water tower lead. The old valve did <br />not isolate the tower completely during the painting project this summer and Houle was <br />the low bid Contractor for the replacement work. Due to the slope of the water line to the <br />tower the new valve and hydrant were placed on the street side of the old valve. This <br />location required shutting down a portion of the City mains in the area to complete the <br />work. While City staff was able to shut the mains down there was some crew time lost <br />waiting. It was agreed that an additional hour of crew time would be paid for the delay. <br />Restoration was not included in the proposed work as we anticipate having the <br />disturbance area seeded by the restoration contractor completing the work on Schletty <br />Drive. <br />We have inspected the work performed by C.W. Houle and recommend payment of the <br />invoice for $27,805.00 as full payment for the work completed. If you have any <br />questions concerning this information, please call me at (763) 780-0450. <br />10062 Flanders Court NE — Blaine, MN 55449 — Ph: (763) 780-0450 Fax (763) 780-0452 <br />Memo.091814-CC (Valve Replacement & Hydrant Payment) <br />