Laserfiche WebLink
MAIN 612-861-6025 <br />FAX 612-861-3297 <br />BUILDING TWIN CITIES LANDMARKS <br />AXEL H. OHMAN <br />CONCRE1T81 do M1+1sON'R.X <br />MINNEAPOLIS, MINN. <br />James Steele <br />Attn: Troy Corbett <br />Re: Little Canada Maintenance- Revised Footing Detail <br />Troy: <br />September 18, 2014 <br />Here are our costs associated with placement of the Fabcon footing detail versus what was <br />detailed in the structural drawings. The Fabcon detail has a 15" deep footing, instead of a 12" <br />thick footing, causing extra forming and more concrete. Also we now had to form a keyway into <br />the footing for the panel. There was 850 LF of this condition. <br />Sincerely, <br />Pctc Pesehe1 <br />Labor: <br />20 Howl ® $81.00- Form/Strip of Footing <br />58 Hours @ $81.00- Form/Strip Keyway <br />6 Hours @ $81.00- Extra Concrete Placement <br />$1,620.00 <br />$4,698.00 <br />$486.00 <br />Material: Keyway Form Material $1,150.00 <br />Deeper Footing Form Material $235.00 <br />25 CY Extra Concrete for Deeper Footing $2,750.00 <br />Total: $10,939.00 <br />I),49 7 <br />With 10% Mark -Up -$12;03.10(-1, — <br />4 /(7 <br />247 W. 61st Street, Mpls. MN 55419 www.aXelohman.com <br />