Laserfiche WebLink
SUBSTANTIAL COMPLETION DATE <br />ORIGINAL: October 31, 2014 <br />REVISED: <br />PARTIAL PAY ESTIMATE #2 <br />FROM: September 28, 2014 <br />T0: October 31, 2014 <br />CONTRACTOR: ASTECH <br />ADDRESS: P.O. Boa 1025. SI. Cloud, MN 56302 <br />OWNER: CITY OF LITTLE CANADA <br />PROJECT: 2014 STREET AND TRAIL IMPROVEMENTS <br />AMOUNT OF CONTRACT <br />ORIGINAL: $ 559,091.76 <br />REVISED: <br />ITEM <br />1 <br />2021.501 <br />ORIGINAL CONTRACT <br />THISPERIOD <br />TOTAL TO DATE <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />QTY. UNIT PRICE <br />QTY. TOTAL PRICE <br />QTY. TOTAL PRICE <br />SCHEDULE 1.D . SCHLETTY DRIVE STREET <br />1 <br />2021.501 <br />MOBILIZATION <br />15 <br />1.00 <br />815.00000 <br />0.00 <br />$0.00 <br />1.00 <br />615,000.00 <br />2 <br />2101.502 <br />CLEARING <br />TREE <br />5.00 <br />6140,00 <br />0.00 <br />60.00 <br />19.00 <br />62,660.00 <br />3 <br />2101.502 <br />CLEARING <br />SF <br />500.00 <br />62.00 <br />0.00 <br />50.03 <br />500.00 <br />61000.00 <br />4 <br />2101507 <br />GRUB <br />TREE <br />5.00 <br />870,00 <br />0.00 <br />60.00 <br />1700 <br />$1,190.00 <br />5 <br />2101.507 <br />GRUB <br />SF <br />500.00 <br />$0.35 <br />0.00 <br />80.00 <br />500.00 <br />51'75.00 <br />6 <br />2104.501 <br />REMOVE CONCRETE CURB &GUTTER <br />LF <br />2,20000 <br />$2.50 <br />0.00 <br />50.00 <br />2,180.0D <br />$5,450.00 <br />7 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />LE <br />38.00 <br />611.00 <br />0,00 <br />60.00 <br />22.00 <br />5242.00 <br />8 <br />2104.503 <br />REMOVE WOOD RETAINING WALL <br />SF <br />50.00 <br />$7.00 <br />0.00 <br />$0.00 <br />50.00 <br />5350.00 <br />9 <br />2104.503 <br />REMOVE AND REINSTALL LANDSCAPING <br />SF <br />350.00 <br />$7.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />10 <br />2104.505 <br />REMOVE CONCRETE PAVEMENT <br />SY <br />125.0D <br />5300 <br />0.00 <br />50.00 <br />131.00 <br />5393.00 <br />11 <br />2104.505 <br />REMOVE BITIIMINOUS PAVEMENT <br />SY <br />4,000.00 <br />52.50 <br />0.00 <br />10.00 <br />3,856.00 <br />$9.640,00 <br />12 <br />2104.509 <br />REMOVE LIGHT POLE <br />EACH <br />2.00 <br />51,030.00 <br />0.00 <br />80.00 <br />0.00 <br />50.00 <br />13 <br />2104.509 <br />REMOVE STORM STRUCTURE <br />EACH <br />1.00 <br />6550.00 <br />0.00 <br />$0.00 <br />1.00 <br />$550.00 <br />14 <br />2104.511 <br />SAW CUT CONCRETE (FULL DEPTH) <br />LF <br />120.00 <br />$3.50 <br />0.00 <br />$00.00 <br />113.00 <br />$395.50 <br />15 <br />2104.513 <br />SAW CUT BITUMINOUS (FULL DEPTH) <br />LE <br />285.00 <br />$2.00 <br />25.00 <br />850.00 <br />289.00 <br />8578.00 <br />16 <br />2104.523 <br />SALVAGE MAILBOX <br />EACH <br />1800 <br />550.00 <br />0.00 <br />80.00 <br />18.00 <br />5900.00 <br />17 <br />2104.523 <br />SALVAGE AND REINSTALL LANDSCAPE BOX <br />EACH <br />2.00 <br />$15000 <br />1.50 <br />8225.00 <br />1.50 <br />5225.00 <br />18 <br />2105.501 <br />COMMON EXCAVATIONIP) <br />CY <br />1.450.00 <br />513.00 <br />100.00 <br />51.300,00 <br />1,450.00 <br />518.850,00 <br />19 <br />2105.501 <br />POND EXCAVATION (RAINWATER GARDEN) <br />CY <br />220.00 <br />615.00 <br />108,00 <br />51.620,00 <br />108.00 <br />51,620.00 <br />20 <br />2105.525 <br />SAND MEDIA <br />CY <br />74.00 <br />$30.00 <br />28.00 <br />$840.00 <br />28.00 <br />584000 <br />21 <br />2105.525 <br />TOPSOIL BORROW <br />CY <br />250.00 <br />52500 <br />258.00 <br />$6,450.00 <br />262.00 <br />56,550.00 <br />22 <br />2105.601 <br />DEWATERING <br />LS <br />1.00 <br />80.01 <br />0.00 <br />$0.00 <br />000 <br />50.00 <br />23 <br />2105.607 <br />MUCK EXCAVATION <br />CY <br />140.00 <br />$15.00 <br />0.00 <br />$0.00 <br />0.00 <br />50.00 <br />24 <br />2123.61 <br />EXPLORATORY DIG <br />HR <br />5.00 <br />585000 <br />0.00 <br />$0.00 <br />2.75 <br />82.337.50 <br />25 <br />2131.502 <br />CALCIUM CHLORIDE <br />GAL <br />2,500.00 <br />5200 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />26 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />2.875.00 <br />515.00 <br />700.00 <br />510.500.00 <br />2,875.00 <br />843,125.00 <br />27 <br />2232501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />15.00 <br />57.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />28 <br />2350.501 <br />TYPE WEAR COURSE MIXTURE <br />TON <br />350.00 <br />$7400 <br />0.00 <br />50.00 <br />0.00 <br />60.00 <br />29 <br />2350.501 <br />TYPE WEAR COURSE MIXTURE(DRIVEWAY) <br />TON <br />25.00 <br />$86.00 <br />25.99 <br />52.235.14 <br />25,99 <br />52.235.14 <br />30 <br />2350.502 <br />TYPE NON WEARING COURSE MIXTURJBASE) <br />1014 <br />440.00 <br />$71.00 <br />440.35 <br />631264.85 <br />440.35 <br />531264.85 <br />31 <br />2422618 <br />INSTALL WOOD RETAINING WALL <br />SF <br />5000 <br />54.00 <br />0.00 <br />$0.00 <br />0.00 <br />5000 <br />32 <br />2502.541 <br />4" PERF PE DRAIN W/800K <br />LE <br />400.00 <br />89.25 <br />394.00 <br />83.644,50 <br />508.00 <br />54.69900 <br />33 <br />2503.541 <br />12" RC PIPE SEWER DES 3006, CLV <br />LE <br />84.00 <br />846.50 <br />000 <br />80.00 <br />84.00 <br />53,906.00 <br />