My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-15-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
12-15-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2014 10:40:33 AM
Creation date
12/16/2014 10:33:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Init. <br />LW <br />"AR Document A133r" - 2009 <br />Standard Form of Agreement Between Owner and Construction Manager as <br />Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed <br />Maximum Price <br />AGREEMENT made as of the Third day of December in the year 2014 <br />BETWEEN the Owner: <br />City of Little Canada <br />515 Little Canada Road E <br />Little Canada, MN 55117 <br />and the Construction Manager: <br />James Steele Construction Company <br />1410 Sylvan Street <br />St. Paul, MN 55117 <br />for the following Project: <br />City of Little Canada City Hall <br />515 Little Canada Road E, Little Canada, Minnesota <br />The Architect: <br />Oertel Architects <br />1795 Saint Clair Avenue <br />St. Paul, MN 55117 <br />The Owner's Designated Representative: <br />Joel Hanson, City Administrator <br />City of Little Canada <br />515 Little Canada Road East <br />Little Canada, MN 55117 <br />651 766-4040 <br />joeLhanson ci.1ittle-canada.nm.us <br />The Construction Manager's Designated Representative: <br />Richard Naughton <br />James Steele Construction Company <br />1410 Sylvan Street <br />St. Paul, MN 55117 <br />651 488-6755 <br />rjn@jsteel econst rocs i on, com <br />The Architect's Designated Representative: <br />Jeff Oertel <br />ADDITIONS AND DELETIONS: <br />The author of this document has <br />added information needed for its <br />completion. The author may also <br />have revised the text of the original <br />AIA standard form. An Additions and <br />Deletions Report that notes added <br />information as well as revisions to <br />the standard form text is available <br />from the author and should be <br />reviewed. A vertical line in the left <br />margin of this document indicates <br />where the author has added <br />necessary information and where <br />the author has added to or deleted <br />from the original AIA text. <br />This document has important legal <br />consequences. Consultation with an <br />attorney is encouraged with respect <br />to its completion or modification. <br />AIA Document 42011m-2007, <br />General Conditions of the Contract <br />for Construction, is adopted in this <br />document by reference. Do not use <br />with other general conditions unless <br />this document is modified. <br />AIA Document 4133'"— 2009 (formerly A121'"CMc — 2003). Copyright 0)1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. <br />WARNING: This AIA` Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' <br />Document, or any portion of 11, nay result in severe civil and criminal penalties, and will ho prosecuted to the maximum extent possibio under the law. <br />This document was produced by A1A software at 16:20.45 on 12/02/2014 under Order No.36440589061 which expires on 08/14/2015, and is not for resale. <br />User Notes: (1970105415) <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.