Laserfiche WebLink
i';vv.21 261= 2:32P11 <br />KIM Erectors, Inc. <br />Box 37 <br />114aple Plain, MN S5359 <br />(763) 4794022 <br />Y'ax ((763) 479-2035 <br />r <br />James Steele Construction <br />ATTN: Troy Corbett <br />XM1 [n ct;rs lac 7634)92035 <br />•513 P <br />WBE / SBE Certified <br />Date 11-21-14 <br />Project Little Canada Maintenance <br />Facility <br />Little Caned 3,' MN <br />PROPOSAL <br />We are pleased to submit the following written proposal for your consideration. <br />ICIYTII Erectors, Inc. excludes miscellaneous steel unless otherwise noted as a bid item; loose lintels, <br />imbedded items, painting, testing, grouting, barricading of openings, cutting of all roof openings and <br />cleaning of all erected material, <br />Assembly of field spliced 60 DLI joists over vehicle storage; add $9,922,00, <br />Forklift — 2 days at $350.00= $ 700.00 <br />Labor — 80 hours at $104,00 w $8,320.00 <br />Overhead & Profit=s= $ 902.00 <br />59,922.00 <br />Dean Bakken <br />Estimator <br />DB/nmp <br />