My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-2015 Planning Comm. Minutes
>
Minutes
>
2010-2019
>
2015
>
02-12-2015 Planning Comm. Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2015 9:44:18 AM
Creation date
2/20/2015 9:43:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />PLANNING COMMISSION <br />FEBRUARY 12, 2015 <br />12,275 square feet of area. The Planner noted that the platting of property <br />resulting in three lots or more have larger minimum standards of 85 feet of <br />lot width and 11,000 square feet of area. <br />The Planner noted that the property would continue to maintain a <br />significant amount of slope from LaBore Road, and a retaining wall is <br />proposed on the westerly lot on both sides of the proposed structure. This <br />wall is necessary to accommodate access to the garage due to the steep <br />grades. The Planner noted that under the Subdivision Code the City can <br />consider whether the necessity for significant retaining walls such as this <br />can affect the reasonableness of the subdivision. <br />The Planner reported that the primary concern relative to this proposed <br />subdivision is storm water and how it will affect the neighboring property <br />to the south. He indicated that the lot sizes as proposed under the <br />proposed subdivision meet R-1 District requirements. The Planner <br />recommended approval of the subdivision as proposed subject to the City <br />Engineer's comments and recommendations relative to storm water <br />controls and the grading plan for the property. <br />The City Engineer reviewed his February 6, 2015 report outlining his <br />review of the Storm Water Management, Erosion Control and Utility Plan <br />that was submitted for this property. The City Engineer indicated that <br />while the storm water treatment plan proposed meets standard <br />requirements, his concern is where water will go when leaving the storm <br />water pond. He also pointed out that he is recommending that the storm <br />water calculations be revised and resubmitted based on the comments in <br />his report including the use of the new Atlas 14 rainfall events. He noted <br />that currently storm water runoff drains south onto private property and <br />pointed out that the development plan as submitted does not change this <br />condition. The Engineer noted the new development will result in more <br />impervious surface. However, under the new plan discharge rates are <br />maintained or lowered for the proposed conditions of a 2 -year, 10 -year, <br />and 100 -year event. During smaller rain events, the overall volume of <br />water discharged from the site will be lowered. During large rain events, <br />the discharge volume will increase, which could adversely affect the <br />property owner to the south. The City Engineer stated that he has <br />concerns relative to the discharge of storm water onto the private property <br />to the south without an improved means of conveyance to a public right- <br />of-way or easement. He indicated that his recommendation would be that <br />the applicant be directed to work with the adjacent property owner to <br />ensure storm water conveyance does not negatively impact 715 Keller <br />Parkway. With regard to the proposed storm water ponds, the City <br />Engineer indicated that there should be cross easements for these ponds as <br />well as a maintenance agreement put in place. The City Engineer <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.