Laserfiche WebLink
Little Canada Maintenance Building - Change Log <br />March 3, 2015 <br />Date <br />Contractor <br />Description <br />Total <br />Approved <br />8/28/2014 <br />Greystone <br />Delete kendering on fabric <br />($1,200) <br />yes <br />8/28/2014 <br />NAC Elec <br />Provide wall mount CT in lieu of pad mount <br />($2,400) <br />yes <br />8/28/2014 <br />NAC Elec <br />Delete hand dryers in locker rooms <br />($1.,500) <br />yes <br />8/28/2014 <br />Axel Ohman <br />Delete stone veneer <br />($43,000) <br />yes <br />8/28/2014 <br />WP by Experts <br />Delete waterproofing at stone veneer <br />($9,675) <br />yes <br />9/18/2014 <br />Axel Ohman <br />Add for higher footing and keyway <br />$6,819 <br />yes <br />9/18/2014 <br />Fabcon <br />Credit for shorter panels due to keyway <br />($2,483) <br />yes <br />9/22/2014 <br />Const. Specialty <br />Delete recessed floor mat <br />($1,321) <br />yes <br />10/1/2014 <br />NAC Elec <br />Conduit for Xcel electric service <br />$2,875 <br />yes <br />9/25/2014 <br />Action Fence <br />Delete pedestrian gate <br />($310) <br />yes <br />9/25/2014 <br />Jaycon <br />Remove buried foundation and slab <br />$2,850 <br />yes <br />11/21/2014 <br />Jaycon <br />Haul in gravel for road in building for crane <br />$2,250 <br />yes <br />11/21/2014 <br />KMH Erectors <br />Field assemble spliced long span bar joist <br />$9,922 <br />yes <br />11/14/2014 <br />Axel Ohman <br />Heat & enclosure for CMU bearing wall <br />$4,006 <br />yes <br />12/3/2014 <br />KMH Erectors <br />Install steel plank edge plate <br />$2,270 <br />yes <br />12/4/2014 <br />Fabcon <br />Deduct grout at wall panel footing <br />($2,017) <br />yes <br />12/4/2014 <br />JSCC <br />Grout at wall panel footing <br />$2,017 <br />yes <br />12/11/2014 <br />Fabcon <br />Cut plank for conduits <br />$1,843 <br />yes <br />12/11/2014 <br />JSCC <br />Shoring and infill of cut plank for conduits <br />$860 <br />yes <br />12/11/2014 <br />NAC Elec <br />Credit core drilling for conduits <br />($500) <br />yes <br />12/22/2014 <br />Crawford Door <br />Provide un -insulated OH door at wash bay <br />($3,500) <br />yes <br />1/15/2015 <br />NAC Elec <br />Salt storage receptacle - conduit flag pole <br />$1,019 <br />yes <br />2/17/2015 <br />NAC Plumbing <br />Branch gas pipe for radiant heat <br />$3,515 <br />Total <br />($27,660) <br />7 <br />