My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-11-2015 Council Packet
>
City Council Packets
>
2010-2019
>
2015
>
03-11-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2015 4:18:20 PM
Creation date
3/6/2015 4:14:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical & Electrical Services <br />1001 Lahore Industrial Court, Suite 0 <br />Vadnais Heights, MN 55110 P: 651-490-9868 F: 651-490-1636 <br />CHANGE ORDER REQUEST #1 <br />Construction Mgr James Steel Construction <br />Troy Corbett <br />FAX: - <br />PHONE: - <br />PROJECT NAME: Little Canada Maintenance Building <br />REQUEST DESCRIPTION: Add gas line to infra -red <br />Using copper type L installed per nac drawing <br />NAC includes the roof generation for the gas pipe. <br />DATE: 1.23.15 <br />NACJOB#: 8341LB <br />RFI #: <br />ASI #: <br />PR #: <br />CONTRACTOR <br />TYPE <br />QTY <br />DESCRIPTION <br />COST <br />EXTENDED <br />30210M <br />1 <br />Additional hanging materials <br />225.00 <br />225.00 <br />100 <br />Copper piping <br />3.25 <br />325.00 <br />Subtotal <br />5°% <br />Contractor Total <br />35.00 <br />585.00 <br />$ - <br />MATERIALS <br />PART# <br />QTY <br />DESCRIPTION <br />COST <br />EXTENDED <br />30210M <br />1 <br />Additional hanging materials <br />225.00 <br />225.00 <br />100 <br />Copper piping <br />3.25 <br />325.00 <br />Shipping <br />Subtotal <br />10% <br />Material Total <br />35.00 <br />585.00 <br />58.50 <br />$ 643.50 <br />LABOR <br />CATEGORY <br />HOURS <br />DESCRIPTION <br />RATE <br />EXTENDED <br />30 <br />Labor Hours <br />87.00 <br />2,610.00 <br />Labor Subtotal <br />10% <br />Labor Total <br />2,610.00 <br />261.00 <br />$ 2,871.00 <br />Please Sign and Return for Work to be started: <br />Submitted by: Lynn Bishop <br />Authorized by: <br />Change Order Sub -Total $ 3,514.50 <br />Bonds 1.35% <br />Change Order Total $ 3,514.50 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.