Laserfiche WebLink
City council in care of Inspection Department. <br />I am proposing a fee schedule change effective 7-1-15 for the following reasons: <br />1. Simplification of fee calculations: <br />A. Simplified the transformers and generator calculations. <br />B. Simplified the panel and sub panel replacement fee calculation. <br />2. Reduction of OFPs <br />A. Changed new house permits to include 3 inspections of any kind Rough -in final or <br />reinspection. <br />3. An approximate fee increase of 6%. <br />4. The fees were established in 2010. Cost of living has Increased by about 7% to 8% In that time -frame, <br />with a corresponding increase in costs (supplies, labor, insurance). <br />Peter Tokle <br />Tokle Inspections Inc. <br />1 <br />