My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-2015 Additions
>
City Council Packets
>
2010-2019
>
2015
>
04-22-2015 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 2:31:48 PM
Creation date
4/24/2015 7:52:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Developer shall attach the approved SWPPP to the third party purchase agreement to ensure full <br />disclosure of this requirement to the third party. <br />19. The Developer shall install Plat monuments within the Plat. Said monuments shall <br />be installed and certified by a registered land surveyor. Monument locations must thereafter be <br />verified prior to the issuance of any Certificates of Occupancy for houses constructed within the <br />development and again after completion of landscaping with replacement of any monuments that <br />are no longer present. <br />20. Developer shall instruct his engineer to provide adequate field inspection personnel <br />to ensure the project is constructed in accordance with approved plans and specifications. In <br />addition, the City's Engineer, at Developer's expense, shall also inspect the construction of <br />Required Improvements for the purpose of certifying the same and recommending acceptance by <br />City. Developer shall also complete construction staking for the project at Developer's expense. <br />Required Improvements <br />21. The Required Improvements include: public streets to serve the Plat; the <br />construction of water main and services; the extension of sanitary sewer main and services; <br />storm sewer and ponding; grading; establishment of vegetation, paving; concrete curb and gutter; <br />signage; street lighting, gas, electric, telecommunication services. Any lighting that may become <br />an ongoing City expense shall be coordinated with the City and Xcel Energy to minimize future <br />operational costs with Developer to bear system installation costs to allow City to attain Xcel <br />Energy's "Customer Owned Group V" rate. All such Required Improvements, except the final <br />lift of blacktop on the road, shall be completed on or before September 30, 2015, at Developer's <br />expense. The final lift of blacktop must be completed by June 30, 2016. Original plans or <br />subsequent changes for said Required Improvements shall be provided to the City Engineer and <br />shall be in accordance with City specifications and standards. <br />- 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.