<br />Interstate Removal Company
<br />dba Interstate Pavement Maintenance
<br />EXH I BIT B
<br />PROPOSAL
<br />Bili To
<br />Service Location
<br />J.W. Moore, inc.
<br />Grant Johnson
<br />714 Pennington P1
<br />Vadnais Heights, MN 55127
<br />Whispering Pines
<br />Attn: Grant Johnson
<br />693 Labore Rd
<br />Little Canada, MN 55117-1220
<br />P.Q. Sox 1028
<br />Forest Lake, MN 55025-5028
<br />Phone: 661-765.0765
<br />Fax: 651.407.0609
<br />Quote#:
<br />Date:
<br />Valid thru:
<br />Sales Person:
<br />11973
<br />3/18/2015
<br />5/17/2015
<br />Erik Paulson
<br />Service
<br />Qty/Hrs Unit Cost Amount
<br />1. - Site grading for a new 7 lot subdivision that includes the following site
<br />grading and street construction items, removal and ownership of excess
<br />generated soils, seed restoration as shown on the plans, a furnishing a
<br />performance bond the contract dollar amount.
<br />2. - Erosion Control: SWPPP, sediment control, seeding, construction
<br />sweeping, certified erosion control specialist assignment.
<br />3. - Demolition: building demolition (phase 1 and hazardous materials removal
<br />by others), to include the foundation, sidewalks, patios, pavement out
<br />buildings and site landscape features.
<br />4. - Clearing: tree clearing, grubbing of stumps and tree protection.
<br />6. - Grading: earthwork to include top soil salvage, grading building pads,
<br />storm water retention/filtration area, construction of road profile, curb
<br />backfill, redistribution of salvaged top soil.
<br />6. - Utilities: installation of sanitary sewer main, water main, hydrants, valves,
<br />storm water system, private sewer and water lateral Installation to the
<br />property lines, right-of-way restoration along Labore Rd. - includes
<br />dewatering.
<br />7.. Street Construction: CL7 aggregate installed, B-612 curb installation,
<br />asphalt paving, tack, wear paving (2016 wear paving included)
<br />8. - Landscaping: shrubs, plantings and trees per the plan.
<br />9. - Alternate 1: asphalt paving removed from the contract (contract directly
<br />with paving company)
<br />10. - Items not included in the quote: construction staking, material testing,
<br />hazardous material handling/abatement, disposal/removal or remediation,
<br />right-of-way approvals, sac/wac charges or fees, winter construction cost.
<br />11. - All sales taxes have been included In the above items.
<br />1.00
<br />1.00 2,800.00 2,800.00
<br />1.00 5,200.00 5,200.00
<br />1.00 8,500.00 8,500.00
<br />1.00 48,200.00 48,200.00
<br />1.00 121, 400.00 121,400,00
<br />1.00 95,000.00 95,000.00
<br />1.00 21,500.00
<br />0.00 64,500.00
<br />0,00
<br />0.00
<br />21,500.00
<br />Thank you.
<br />Erik Paulson 661-965-2587 Email: erik.paulson©interstatepm.com
<br />Total: $302,600.00
<br />Page 1 of 2 4/14/201E. 13:28