Laserfiche WebLink
Ifeerde.44 ediffogoee4 <br />Interstate Removal Company <br />dba Interstate Pavement Maintenance <br />EXH I BIT B <br />PROPOSAL <br />Bili To <br />Service Location <br />J.W. Moore, inc. <br />Grant Johnson <br />714 Pennington P1 <br />Vadnais Heights, MN 55127 <br />Whispering Pines <br />Attn: Grant Johnson <br />693 Labore Rd <br />Little Canada, MN 55117-1220 <br />P.Q. Sox 1028 <br />Forest Lake, MN 55025-5028 <br />Phone: 661-765.0765 <br />Fax: 651.407.0609 <br />Quote#: <br />Date: <br />Valid thru: <br />Sales Person: <br />11973 <br />3/18/2015 <br />5/17/2015 <br />Erik Paulson <br />Service <br />Qty/Hrs Unit Cost Amount <br />1. - Site grading for a new 7 lot subdivision that includes the following site <br />grading and street construction items, removal and ownership of excess <br />generated soils, seed restoration as shown on the plans, a furnishing a <br />performance bond the contract dollar amount. <br />2. - Erosion Control: SWPPP, sediment control, seeding, construction <br />sweeping, certified erosion control specialist assignment. <br />3. - Demolition: building demolition (phase 1 and hazardous materials removal <br />by others), to include the foundation, sidewalks, patios, pavement out <br />buildings and site landscape features. <br />4. - Clearing: tree clearing, grubbing of stumps and tree protection. <br />6. - Grading: earthwork to include top soil salvage, grading building pads, <br />storm water retention/filtration area, construction of road profile, curb <br />backfill, redistribution of salvaged top soil. <br />6. - Utilities: installation of sanitary sewer main, water main, hydrants, valves, <br />storm water system, private sewer and water lateral Installation to the <br />property lines, right-of-way restoration along Labore Rd. - includes <br />dewatering. <br />7.. Street Construction: CL7 aggregate installed, B-612 curb installation, <br />asphalt paving, tack, wear paving (2016 wear paving included) <br />8. - Landscaping: shrubs, plantings and trees per the plan. <br />9. - Alternate 1: asphalt paving removed from the contract (contract directly <br />with paving company) <br />10. - Items not included in the quote: construction staking, material testing, <br />hazardous material handling/abatement, disposal/removal or remediation, <br />right-of-way approvals, sac/wac charges or fees, winter construction cost. <br />11. - All sales taxes have been included In the above items. <br />1.00 <br />1.00 2,800.00 2,800.00 <br />1.00 5,200.00 5,200.00 <br />1.00 8,500.00 8,500.00 <br />1.00 48,200.00 48,200.00 <br />1.00 121, 400.00 121,400,00 <br />1.00 95,000.00 95,000.00 <br />1.00 21,500.00 <br />0.00 64,500.00 <br />0,00 <br />0.00 <br />21,500.00 <br />Thank you. <br />Erik Paulson 661-965-2587 Email: erik.paulson©interstatepm.com <br />Total: $302,600.00 <br />Page 1 of 2 4/14/201E. 13:28 <br />