Laserfiche WebLink
estimates must note any significant changes in the work to be performed on the Project, or <br />in its costs, which have arisen since the appropriation from the legislature for the Project <br />was enacted or which differ from any previous predesign submittal. <br />D. The Grant Recipient must notify the Chairs and Ranking Minority Members of <br />the Minnesota State Senate Finance and Capital Investment Committees, and the <br />Minnesota House of Representatives Capital Investment and Ways and Means Committees <br />of any significant changes to the program plan and cost estimates referred to in Section <br />6.10.C. <br />E. The program plan and cost estimates referred to in Section 6.10.0 must ensure <br />that the Project will comply with all applicable energy conservation standards contained in <br />law, including Minn. Stat, §§ 216C,19 to 216C.20, as they may be amended, modified or <br />replaced from time to time, and all rules adopted thereunder. <br />F. If any of the Grant is to be used for the construction or remodeling of the <br />Facility, then both the predesign package referred to in Section 6.10,B and the program <br />plan and cost estimates referred to in Section 6.10.0 must include provisions for cost- <br />effective information technology investments that will enable the occupant of the Facility <br />to reduce its need for office space, provide more of its services electronically, and <br />decentralize its operations. <br />G. If the Project does not involve the construction of a new building, substantial <br />addition to an existing building, substantial change to the interior configuration of an <br />existing building, or the acquisition of an interest in land, then prior to beginning work on <br />the Project the Grant Recipient shall just notify the Chairs and Ranking Minority Members <br />of the Minnesota State Senate Finance and Capital Investment Committees, and the <br />Minnesota House of Representatives Capital Investment and Ways and Means Committees <br />that the work to be performed is ready to begin. <br />H. The Project must be: (i) completed in accordance with the program plan and <br />cost estimates referred to in Section 6.10.C, (ii) completed in accordance with the time <br />schedule contained in the program plan referred to in Section 6.10.C, and (iii) completed <br />within the budgets contained in the cost estimates referred to in Section 6.10,C. <br />Provided, however, the provisions and requirements contained in this Section 6.10 only <br />apply to public lands or buildings or other public improvements of a capital nature, and shall not <br />apply to the demolition or decommissioning of state assets, hazardous material projects, utility <br />infrastructure projects, environmental testing, parking lots, parking structures, park and ride <br />facilities, bus rapid transit stations, light rail lines, passenger rail projects, exterior lighting, <br />fencing, highway rest areas, truck stations, storage facilities not consisting primarily of offices or <br />heated work areas, roads, bridges, trails, pathways, campgrounds, athletic fields, dams, <br />floodwater retention systems, water access sites, harbors, sewer separation projects, water and <br />wastewater facilities, port development projects for which the Commissioner of Transportation <br />for the State of Minnesota has entered into an assistance agreement under Minn. Stat. § 457A.04, <br />as it may be amended, modified or replaced from time to time, ice centers, local government <br />Little Caanda GO Bond Proceeds Grant Agreement Ver — 5/06/15 <br />for MnDOT Antiquated Equipment Grants 23 <br />