My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-2015 Council Packet
>
City Council Packets
>
2010-2019
>
2015
>
05-11-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:45:21 AM
Creation date
5/8/2015 9:35:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cost of the steel or iron is more than 0.1 percent of the total project cost or $2,500 (whichever is <br />greater), COMPANY must use steel or iron melted or manufactured in the United States. <br />Materials that have been removed from the United States for any process (e.g., change in <br />chemical content, shape, size or finish) are not considered domestic materials. The Buy <br />American Memorandum which lists Company requirement, Exhibit "D", is attached and <br />incorporated into this Agreement <br />SECTION 2, The COMPANY owns all right of way needed to operate the proposed <br />improvement. <br />SECTION 3. The COMPANY shall furnish, or cause to be furnished, all of the labor, materials <br />and work equipment required to install a complete railroad crossing signal system with flashing <br />light, gates, constant warning timing circuitry and LED lenses on <roadway name>, at the location <br />indicated on Exhibit "B". The placement of the signals must be in accordance with Part VIII of <br />the Minnesota manual on Uniform Traffic Devices (MMUTCD). The Company's detailed plans <br />and specifications for the work to be done must be submitted to and approved by the State of <br />Minnesota, prior to starting work. <br />The estimated total cost of the work to be performed hereunder by the COMPANY at the <br />expense of the CITY as outlined above is $ as indicated in the detailed estimate of cost <br />attached hereto and marked Exhibit "B". <br />The project will be funded using State General Obligation bonds, Federal funds and City funds. <br />The CITY will pay the COMPANY as provided herein for only such items and expense as are <br />proper and eligible for payment. Only materials actually incorporated into the project will be <br />eligible for reimbursement. <br />The Cost division is estimated as: <br />Federal funds $5,000.00 <br />State GO Bonds $ <br />CITY Contribution $ <br />Total Estimated cost $ <br />The COMPANY warrants that it shall perform all work under this agreement in a workmanlike <br />and timely manner in accordance with all applicable standards for work of the type at issue. <br />Should the work fail to be performed in a timely manner or in accordance with applicable <br />standards, the CITY may immediately suspend further payments under this agreement and the <br />COMPANY shall repay all funds expended on unsatisfactory work. <br />SECTION 4. The COMPANY shall operate and maintain the crossing warning devices in <br />accordance with Federal or State law as it shall be from time to time in the future while it <br />0904/SCP -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.