My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-2015 Council Packet
>
City Council Packets
>
2010-2019
>
2015
>
05-27-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2015 1:36:49 PM
Creation date
5/27/2015 1:25:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.5. Construction Engineering and Administration Costs <br />6.5.1. The County shall pay the City a construction engineering fee equal to <br />12% of the County's share of the items identified in Exhibit A, which will <br />include costs for materials testing. <br />6.5.2. Construction engineering shall be calculated based on the final contract <br />quantities and unit prices. <br />7. Payment Schedule <br />7.1. Upon completion of the project, the City will invoice the County for design <br />engineering, construction engineering, and construction costs. <br />7.2. The County will make payment to the City no later than February 1, 2017. <br />7.3. If the County does not make the required payment by February 1, 2017, the <br />County will reimburse the City for the costs of issuing temporary bonds to be <br />used to pay the County's share of the Project including all interest payable <br />thereon. <br />8. Maintenance Responsibility for Project Elements <br />8.1. Ownership and Maintenance Responsibility of the Roadway <br />8.1.1. The County shall own and maintain the roadway and associated roadway <br />elements located within the County Right of Way, except as detailed <br />below. <br />8.2. Ownership and Maintenance Responsibility of the Stormsewer System <br />8.2.1. The City shall own and maintain the following components of the <br />stormsewer system: <br />1. Trunk line <br />ii. Trunk line manholes <br />iii. Surface drains located outside of the County road right-of-way and <br />associated leads <br />iv. Trunk line outfalls <br />v. Storm water management pond <br />8.2.2. The County shall own and maintain the following components of the <br />stormsewer system: <br />i. Catch basins <br />ii. Catch basin leads <br />PUBW2015-04 Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.