Laserfiche WebLink
,ITEMI <br />!NUR, <br />ITEM`DESCR1PTIi <br />`ORLGINA11eQNTRAC_— <br />rpQMARTI.NIIRRT3TOE <br />f�r�l<�E�iE�TJ11SP�fQD ,0)a,zl@V'Ili,illln <br />ViTOTAl TQ -DATE - <br />';QTYF a 1 r_=70TPiL FRfC;E <br />6 <br />2504,603 <br />1" TYPE K COPPER PIPE <br />LF <br />450.00 <br />$28,00 <br />0,00 <br />$0,00 <br />437.00 <br />$12,236,00 <br />6 <br />2504,603 <br />6" DUCTILE IRON WATERMAIN CL52 <br />LF <br />4500 <br />$39.00 <br />0,00 <br />$0,00 <br />26.00 <br />$1,014,00 <br />7 <br />2504,603 <br />8" DUCTILE IRON WATERMAIN CL52 <br />LF <br />1,060,00 <br />$44,00 <br />0,00 <br />$0,00 <br />1,034,00 <br />$46,496.00 <br />8 <br />2504.808 <br />DUCTILE IRON FITTINGS <br />LB <br />470,00 <br />$8,00 <br />0,00 <br />$0.00 <br />619,00 <br />$4,152,00 <br />$55,25 <br />6 <br />2101.607 <br />GRUB <br />TREE <br />1,00 <br />$70,00 <br />0,00 <br />$0.00 <br />1.00 <br />SCHEDULE 2.0 • SCHLETTY WATERMAIN -- TOTAL $0,00 $100,84500 <br />SCHEDULE 3.0 • WATERWORKS TRAIL CROSSING <br />1 <br />2021,501 <br />MOBILIZATION <br />LS <br />1,00 <br />$1,00 <br />0,00 <br />$0.00 <br />1,00 <br />$1.00 <br />2 <br />2101,601 <br />CLEARING <br />SF <br />6,025.00 <br />$1.00 <br />0,00 <br />40,00 <br />5,525,00 <br />$5,525.00 <br />3 <br />2101.502 <br />CLEAR <br />TREE <br />1.00 <br />4175,00 <br />0,00 <br />• 60,00 <br />1.00 <br />$175.00 <br />4 <br />2101.500 <br />GRUBBING <br />SF <br />5,025.00 <br />$0,01 <br />0.00 <br />$0,00 <br />6,525.00 <br />$55,25 <br />6 <br />2101.607 <br />GRUB <br />TREE <br />1,00 <br />$70,00 <br />0,00 <br />$0.00 <br />1.00 <br />$70,00 <br />6 <br />2104.601 <br />REMOVE CHAIN LINK FENCE <br />LF <br />50,00 <br />$11,00 <br />0.00 <br />$0,00 <br />50.00 <br />4550,00 <br />7 <br />2104.605 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />40,00 <br />$2.75 <br />0.00 <br />$0.00 <br />1000 <br />$27.50 <br />8 <br />2104,623 <br />SALVAGE SIGN <br />EACH <br />1.00 <br />$210,00 <br />0,00 <br />$0,00 <br />1.00 <br />$210.00 <br />9 <br />2105,501 <br />COMMON EXCAVATION (P) <br />FILL SPECIAL (P) <br />Gy <br />Cy <br />150,00 <br />1,136.00 <br />$9.50 <br />48,00 <br />0,00 <br />0,00 <br />$0.00 <br />$000 <br />150,00 <br />1,136,00 <br />$1,425.00 <br />$9,088,00 <br />10 <br />2105.521 <br />11 <br />2106,604 <br />GEOTEXTILE FABRIC <br />SY <br />1,100.00 <br />$2.50 <br />0,00 <br />$0.00 <br />980.00 <br />$2,450,00 <br />12 <br />2211,501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />700.00 <br />$19.00 <br />0,00 <br />$0,00 <br />300.42 <br />$5,707.98 <br />13 <br />2350.501 <br />TYPE WEAR COURSE MIXTURE <br />TON <br />110.00 <br />$100.00 <br />0,00 <br />$0.00 <br />114.76 <br />411,475.00 <br />14 <br />2411.604 <br />MODULAR BLOCK RETAINING WALL <br />Sr <br />350,00 <br />$22.00 <br />0.00 <br />$0.00 <br />78,00 <br />$1,716.00, <br />15 <br />2503,603 <br />12" DUAL WALL HDPE PIPE SEWER <br />LF <br />55,00 <br />$40.00 <br />0.00 <br />$0,00 <br />55.00 <br />$2,200.00 <br />16 <br />2521.501 <br />CONCRETEPAVEMENT(6"THICK) <br />SF <br />80,00 <br />615.00 <br />83,00 <br />$1,246,00 <br />83.00 <br />$1,245.00 <br />17 <br />2557.603 <br />INSTALL CHAIN LINK FENCE <br />LF <br />460.00 <br />$21.00 <br />410.00 <br />48,610.00 <br />410.00 <br />$8,610,00 <br />18 <br />2557,603 <br />INSTALL STEEL RAIL SAFETY FENCE <br />LF <br />107.00 <br />$140.00 <br />197.00 <br />427,680.00 <br />197.00 <br />$27,680,00 <br />19 <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LF <br />1,700,00 <br />$2,00 <br />0.00 <br />$0,00 <br />1,000.00 <br />$2,000.00 <br />20 <br />2576.604 <br />SEEDING <br />SY <br />4,600.00 <br />42.25 <br />4.00 <br />$9.00 <br />4,004,00 <br />$9,009.00 <br />21 <br />2582,503 <br />12" X 8' WHITE STRIPE - EPDXY <br />EACH <br />2,00 <br />$110,00 <br />0.00 <br />$0,00 <br />0.00 <br />$0.00 <br />2.2 <br />2582.503 <br />RR CROSSING STRIPING - EPDXY <br />EACH <br />2,00 <br />$640.00 <br />0.00 <br />$0,00 <br />0.00 <br />$0,00 <br />23 <br />SPEC <br />DENSITY TEST <br />EACH <br />14,00 <br />$55.00 <br />0.00 <br />$0.00 <br />0,00 <br />$0,00 <br />24 <br />SPEC <br />PROCTOR TEST <br />EACH . <br />3.00 <br />6125.00 <br />0,00 <br />$0.00 <br />0,00 <br />60.00 <br />26 <br />SPEC <br />GRADATION TEST <br />EACH <br />3,00 <br />6126,00 <br />0.00 <br />$0,00 <br />0.00 <br />$0.00 <br />26 <br />SPEC <br />EXTRACTION/GRADATION <br />EACH <br />1.00 <br />4150,00 <br />0,00 <br />$0.00 <br />0,00 <br />$0,00 <br />27 <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />EACH <br />3,00 <br />$180.00 <br />0.00 <br />$0.00 <br />0,00 <br />$0.00 <br />SCHEDULE 3,0 - WATERWORKS TRAIL CROSSING - TOTAL $37,444,00 669,119,73 <br />SCHEDULE 4,0 • TRAIL REALIGNMENTS <br />1 <br />2021,501 <br />MOBILIZATION <br />LS <br />1,00 <br />$1.00 <br />0,00 <br />40,00 <br />1,00 <br />$1,00 <br />2 <br />2104,605 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />450 <br />$2.50 <br />0.00 <br />$0,00 <br />339,00 <br />$847.50 <br />3 <br />2105,501 <br />COMMON EXCAVATION (P) <br />CY <br />200.00 <br />$9.00 <br />0,00 <br />$0.00 <br />200.00 <br />61,800.00 <br />4 <br />2105.604 <br />GEOTEXTILE FABRIC <br />SY <br />735,00 <br />$2.00 <br />0.00 <br />$0,00 <br />660.00 <br />$1,320.00 <br />