Laserfiche WebLink
ITEM <br />NO, <br />1 <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY, UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />68 <br />2531,601 <br />1,00 <br />CONCRETE CURB & GUTTER DESIGN B624 <br />LF <br />6,100,00 <br />13,40 <br />0,00 <br />$0,00 <br />13,362.79 <br />28,015,38 <br />6600,00 <br />$76,040,00 <br />69 <br />2631,607 <br />3 <br />CONCRETE DRIVEWAY APRON (6" THICK) <br />SY <br />65,00 <br />44,90 <br />0,00 <br />$0,00 <br />GRUB <br />72,20 <br />$3,241,78 <br />70 <br />2531,607 <br />$0.00 <br />$0.00 <br />CONCRETE DRIVEWAY APRON (8" THICK) <br />SY <br />65,00 <br />64,30 <br />0,00 <br />$0,00 <br />REMOVE CONCRETE CURB AND GUTTER <br />90,10 <br />$4,892,43 <br />71 <br />253 <br />.607 <br />CONCRETE DRIVEWAY PAVEMENT (6" THICK) <br />SY <br />140,00 <br />44.90 <br />0,00 <br />$0,00 <br />$196,80 <br />79.70 <br />$3,678,63 <br />72 <br />253 <br />,602 <br />CONCRETE PEDESTRIAN RAMP (6" THICK) <br />SF <br />2,300,00 <br />5,00 <br />0.00 <br />$0,00 <br />2668,30 <br />$13,341.60 <br />73 <br />263 <br />.618 <br />TRUNCATED DOMES <br />SF <br />276.00 <br />36.50 <br />0,00 <br />$0,00 <br />264.00 <br />$9,271,00 <br />74 <br />2531,618 <br />1.00 <br />1,33' WIDE COLORED CONCRETE <br />SF <br />1,380,00 <br />7,10 <br />0,00 <br />$0,00 <br />$325.00 <br />1697.00 <br />$12,048,70 <br />75 <br />253 <br />.618 <br />COLORED CONCRETE <br />SF <br />1,050,00 <br />7,10 <br />0,00 <br />$0,00 <br />$110,00 <br />1126.00 <br />$7,994,60 <br />76 <br />2540.602 <br />INSTALL MONUMENT <br />EACH <br />3,00 <br />736,00 <br />0,00 <br />$0,00 <br />338,00 <br />0.00 <br />$0.00 <br />11 <br />77 <br />2640,602 <br />INSTALL <br />SALVAGED BANNER POLE <br />260,00 <br />2,00 <br />2,000,00 <br />0,00 <br />$0,00 <br />952,00 <br />0,00 <br />60,00 <br />78 <br />2640,602 <br />INSTALL. <br />SALVAGED MAILBOXES <br />• <br />LF <br />14,00 <br />260.00 <br />105,00 <br />10,00 <br />0,00 <br />0,00 <br />$0,00 <br />60.00 <br />6.00 <br />10,00 <br />143.00 <br />$1,060,00 <br />$1,430,00 <br />13 <br />79 <br />2640,803 <br />LANDSCAPE EDGER <br />80 <br />2545,602 <br />ADJUST LIGHT <br />EACH <br />1.00 <br />1,500,00 <br />0,00 <br />$0,00 <br />00,00 <br />0650,00 <br />1,00 <br />$1,500,00 <br />2105.523 <br />81 <br />2557,803 <br />INSTALL CHAIN LINK FENCE <br />LP <br />160.00 <br />20.00 <br />0.00 <br />60.00 <br />0,00 <br />160,00 <br />$0,00 <br />63,200,00 <br />82 <br />2667,803 <br />INSTALL SPILIT RAIL FENCE <br />LF <br />130,00 <br />40.00 <br />0.00 <br />$0,00 <br />045.00 <br />166.00 <br />66,200,00 <br />83 <br />2663,601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />19,426.00 <br />0.00 <br />$0,00 <br />244,00 <br />42.00 <br />1.00 <br />$19,426,00 <br />84 <br />2564,531 <br />F & I SIGN PANEL <br />SF <br />260,00 <br />26.26 <br />0.00 <br />9 <br />60,00 <br />168.13 <br />SF <br />64,413,41 <br />86 <br />2564,802 <br />F & I SIGN POST <br />EACH <br />47,00 <br />52,60 <br />0,00 <br />20 <br />$0,00 <br />28.00 <br />LF <br />$1,470,00 <br />86 <br />2673,502 <br />SILT FENCE TYPE MACHINE SLICED <br />LP <br />1,500.00 <br />3,00 <br />0.00 <br />0,00 <br />21 <br />60.00 <br />$0.00 <br />745.00 <br />0.00 <br />LF <br />$2,236.00 <br />00.00 <br />87 <br />2573,52 <br />SEDIMENT REMOVAL BACKHOE <br />HR <br />30.00 <br />176,00 <br />88 <br />2573,53 <br />INLET PROTECTION (WIMCO) <br />EACH <br />21.00 <br />200,00 <br />0.00 <br />0.00 <br />$0,00 <br />43.00 <br />68,800,00 <br />89 <br />2673.63 <br />INLET PROTECTION STRUCTURE W/O CASTING) <br />EACH <br />17.00 <br />160,00 <br />0.00 <br />$54,30 <br />60.00 <br />13,00 <br />$1,950,00 <br />90 <br />2573,602 <br />INLET SEDIMENT REMOVAL <br />EACH <br />54.00 <br />76,00 <br />0.00 <br />350.00 <br />60.00 <br />21.00 <br />$1,676,00 <br />91 <br />2673,607 <br />ROADWAY ROCK CHECK DAM <br />CY <br />200.00 <br />60,00 <br />0,00 <br />SF <br />60.00 <br />26.66 <br />$1,332,60 <br />92 <br />2575,505 <br />SODDING 'TYPE SALT RESISTANT <br />SY <br />7,700,00 <br />3,25 <br />0,00 <br />INSTALL MONUMENT <br />00.00 <br />5227,50 <br />$16,989,38 <br />93 <br />2576,513 <br />MULCH MATERIAL TYPE SPECIAL. <br />CY <br />75.00 <br />40.00 <br />0,00 <br />$0,00 <br />52,00 <br />92,080,00 <br />94 <br />2676.523 <br />EROSION CONTROL BLANKET (CATEGORY 8) <br />SY <br />480.00 <br />1,95 <br />0.00 <br />$0,00 <br />460,00 <br />$877,50 <br />96 <br />2575,604 <br />COMPOST GRADE 2 (SPECIAL) <br />SY <br />850,00 <br />10,00 <br />0.00 <br />$0,00 <br />235.00 <br />$2,360,00 <br />96 <br />2676,604 <br />SEEDING (TYPE 270) <br />SY <br />480,00 <br />1,26 <br />0,00 <br />$0.00 <br />750.00 <br />6937.50 <br />97 <br />2682.501 <br />PAVT MSSG (LT-THRU SYMBOL) EPDXY <br />EACH <br />3.00 <br />183,00 <br />0.00 <br />$0,00 <br />3,00 <br />$649,00 <br />98 <br />2682.601 <br />PAVT MSSG (RT TURN SYMBOL) EPDXY <br />EACH <br />4.00 <br />130.00 <br />0.00 <br />$0,00 <br />4,00 <br />$620,00 <br />99 <br />2582,602 <br />4" SOLID L NE WHITE - EPDXY <br />F <br />6,600.00 <br />0.24 <br />0,00 <br />'0,00 <br />6600,00 <br />$1,684.00 <br />100 <br />2582,502 <br />4" BROKEN LINE WHITE - EPDXY <br />LF <br />300,00 <br />0.24 <br />0.00 <br />$0.00 <br />300.00 <br />$72,00 <br />101 <br />2582,602 <br />24" STOP LINE, WHITE - EPDXY <br />LF <br />156,00 <br />8.40 <br />0.00 <br />$0,00 <br />156,00 <br />$1,302.00 <br />102 <br />2582,502 <br />4" DOUBLE SOLID LINE YELLOW - EPDXY <br />LF <br />6,450,00 <br />0.48 <br />0.00 <br />$0,00 <br />6450.00 <br />93,095,00 <br />103 <br />2682,503 <br />CROSSWALK MARKING - EPDXY <br />SF <br />710,00 <br />4.70 <br />0,00 <br />$0,00 <br />810,00 <br />$3,807.00 <br />SCHEDULE 1.0 - LITTLE CANADA ROAD - TOTAL $6,060,00 $1,062,951,33 <br />ALTERNATE IM - LITTLE CANADA ROAD ALTERNATE <br />1 <br />2104.609 <br />REMOVE HYDRANT AND VALVE <br />EACH <br />1.00 <br />1,890.00 <br />0,00 <br />$0,00 <br />1,00 <br />$1,890.00 <br />2 <br />2411.618 <br />BLOCK RETAINING WALL SPECIAL (WET CAST) <br />SF <br />600,00 <br />36,00 <br />0,00 <br />$0,00 <br />385.26 <br />$13,869,00 <br />3 <br />2504,602 <br />INSTALL HYDRANT AND VALVE <br />EACH <br />1,00 <br />6,226,00 <br />345.00 <br />0,00 <br />0,00 <br />$0,00 <br />$0,00 <br />1,00 <br />1.00 <br />$6,225,00 <br />$345,00 <br />4 <br />2604,602 <br />ADJUST VALVE <br />EACH <br />1.00 <br />5 <br />2621.601 <br />4" CONCRETE SIDEWALK <br />SF <br />1,080,00 <br />125,00 <br />3,10 <br />40.00 <br />0,00 <br />0,00 <br />$0,00 <br />$0,00 <br />746,00 <br />113.00 <br />$2,309,50 <br />$4,620,00 <br />6 <br />2657.603 <br />INSTALL SPLIT RAIL FENCE <br />LF <br />ALTERNATE 1.0 - LITTLE CANADA ROAD -- TOTAL $0.00 629,168,60 <br />SCHEDULE 2,0 • CHANGE ORDERS <br />1 <br />SPEC <br />CHANGE ORDER#1 (665 LC ROAD SERVICES) <br />LS <br />1,00 <br />10,896.00 <br />0.00 <br />$0.00 <br />1,00 <br />610,896,00 <br />2 <br />SPEC <br />CHANGE ORDER #2 <br />LS <br />1.00 <br />13,362.79 <br />28,015,38 <br />0.00 <br />0,00 <br />$0.00 <br />$0.00 <br />1,00 <br />1,00 <br />$13,382.79 <br />$28,015,38 <br />3 <br />SPEC <br />CHANGE ORDER#3 <br />LS <br />1,00 <br />SCHEDULE 2.0 - CHANGE ORDERS •• TOTAL $0.00 $52,274,17 <br />SCHEDULE 3.0 - SUPPLEMENTAL #1 SIDEWALK ADDITION <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />$7,000.00 <br />0,00 <br />00.00 <br />0,60 <br />$3,500,00 <br />2 <br />2101,602 <br />CLEAR <br />TREE <br />4.00 <br />$360.00 <br />0,00 <br />90,00 <br />4,00 <br />$1,400.00 <br />3 <br />2101.607 <br />GRUB <br />TREE <br />LF <br />6,00 <br />145,00 <br />$260.00 <br />$12,00 <br />0,00 <br />0.00 <br />$0.00 <br />$0.00 <br />5.00 <br />469,00 <br />61,250,00 <br />$6,628,00 <br />4 <br />2104,501 <br />REMOVE CONCRETE CURB AND GUTTER <br />5 <br />2104.503 <br />SALVAGE RETAINING WALL <br />SF <br />40.00 <br />$16.00 <br />0,00 <br />$0.00 <br />12,30 <br />$196,80 <br />6 <br />2104.505 <br />REMOVE CONCRETE PAVEMENT <br />SY <br />165,00 <br />$7.50 <br />0.00 <br />60.00 <br />220.00 <br />$1,650.00 <br />7 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />375,00 <br />95,65 <br />0.00 <br />00.00 <br />493,00 <br />$2,786,45 <br />8 <br />2104,507 <br />REMOVE PHONE BOOTH <br />EACH <br />1.00 <br />$326,00 <br />0.00 <br />$0,00 <br />1,00 <br />$325.00 <br />9 <br />2104.607 <br />REMOVE SIGN BASE <br />EACH <br />1.00 <br />$110,00 <br />0.00 <br />90,00 <br />1,00 <br />$110,00 <br />10 <br />2104.511 <br />SAW CUT CONCRETE (FULL DEPTH) <br />LF <br />72.00 <br />62,65 <br />0,00 <br />$0,00 <br />338,00 <br />$890,40 <br />11 <br />2104.613 <br />SAW CUT BITUMINOUS (FULL DEPTH) <br />LF <br />260,00 <br />92,35 <br />0,00 <br />$0,00 <br />952,00 <br />$2,237,20 <br />12 <br />2104,523 <br />SALVAGE SIGN <br />EACH <br />3,00 <br />$28,00 <br />0,00 <br />$0,00 <br />6.00 <br />8156,00 <br />13 <br />2104.623 <br />SALVAGE MAILBOX <br />EACH <br />EACH <br />13.00 <br />1.00 <br />936,76 <br />$650,00 <br />0.00 <br />0.00 <br />$0.00 <br />90.00 <br />0.00 <br />1.00 <br />00,00 <br />0650,00 <br />14 <br />2105.523 <br />SALVAGE LIGHT <br />15 <br />2106,601 <br />COMMON EXCAVATION (P) <br />CY <br />250,00 <br />630.00 <br />0,00 <br />$0,00 <br />264.00 <br />$7,620,00 <br />16 <br />2106,625 <br />TOP SOIL BORROW (CV) <br />CY <br />80,00 <br />045.00 <br />0,00 <br />$0,00 <br />62,26 <br />$2,801.25 <br />7 <br />2211,601 <br />2350,501 <br />AGGREGATE BASE, CLASS 6 <br />TYPE SPWEB340C WEARING COURSE MIX(DRIVEWAY) <br />TON <br />TON <br />244,00 <br />42.00 <br />$19,50 <br />$150.00 <br />0,00 <br />0.00 <br />$0.00 <br />$0,00 <br />173.14 <br />98,33 <br />93,376,23 <br />$14,749,50 <br />8 <br />9 <br />2521,501 <br />4" CONCRETE SIDEWALK <br />SF <br />3,060,00 <br />$2,90 <br />0,00 <br />$0,00 <br />3888,00 <br />$11,275,20 <br />20 <br />2531,501 <br />CONCRETE CURB & GUTTER B612 <br />LF <br />100.00 <br />$19,70 <br />0.00 <br />$0.00 <br />81,50 <br />$1,606.65 <br />21 <br />2631.601 <br />CONCRETE CURB & GUTTER DESIGN B624 <br />LF <br />65,00 <br />$19,70 <br />0.00 <br />$0,00 <br />357,00 <br />$7,032,90 <br />22 <br />2631.507 <br />CONCRETE DRIVEWAY PAVEMENT (6" THICK, <br />SY <br />185,00 <br />$44.90 <br />0.00 <br />$0.00 <br />78.70 <br />93,533,63 <br />23 <br />2531.507 <br />CONCRETE DRIVEWAY PAVEMENT (8" THICK' <br />SY <br />110,00 <br />$54,30 <br />0.00 <br />$0.00 <br />173,80 <br />$9,437.34 <br />24 <br />2631,602 <br />CONCRETE PEDESTRIAN RAMP (6" THICK) <br />SF <br />350.00 <br />$6.00 <br />0,00 <br />$0,00 <br />98,00 <br />$490.00 <br />26 <br />2631.618 <br />TRUNCATED DOMES <br />SF <br />8,00 <br />$36.60 <br />0.00 <br />$0,00 <br />12.00 <br />$438,00 <br />26 <br />2640.602 <br />INSTALL MONUMENT <br />EACH <br />1,00 <br />$1,126,00 <br />0.00 <br />$0,00 <br />0,00 <br />$0,00 <br />