Laserfiche WebLink
Item No. Description Unit <br />Estimated <br />Total <br />Quantity <br />Estimated <br />Unit Price <br />Estimated Total <br />Cost <br />1 MOBILIZATION LUMP SUM 1 $8,000.00 $8,000.00 <br />2 CLEARING AND GRUBBING LUMP SUM 1 $500.00 $500.00 <br />3 DEWATERING LUMP SUM 1 $5,000.00 $5,000.00 <br />4 2" FORCE MAIN HDPE LIN FT 6,991 $18.00 $125,832.87 <br />5 ELECTRICAL SERVICE LUMP SUM 1 $12,000.00 $12,000.00 <br />6 IRRIGATION METER AND CONTROLS EACH 2 $3,000.00 $6,000.00 <br />7 LIFT STATION, FILTER, CONTROLS, AND APPURTENANCES* LUMP SUM 2 $55,000.00 $110,000.00 <br />8 SILT FENCE, TYPE HEAVY DUTY LIN FT 250 $3.50 $875.00 <br />9 CONCRETE PUMP PAD EACH 2 $1,000.00 $1,000.00 <br />SUBTOTAL $269,207.87 <br />+ 10% CONTINGENCY $26,920.79 <br />CONSTRUCTION SUBTOTAL $296,128.66 <br />+ 20% INDIRECT $59,225.73 <br />TOTAL $356,000.00 <br />Opinion of Probable Cost <br />A. Irrigating Public Spaces (Park and Berms)