Laserfiche WebLink
Item No. Description Unit <br />Estimated <br />Total <br />Quantity <br />Estimated Unit <br />Price <br />Estimated Total <br />Cost <br />1 MOBILIZATION LUMP SUM 1 $93,100.00 $93,100.00 <br />2 CLEARING AND GRUBBING LUMP SUM 1 $500.00 $500.00 <br />3 DEWATERING LUMP SUM 1 $5,000.00 $5,000.00 <br />4 2" FORCE MAIN HDPE LIN FT 6,991 $18.00 $125,838.00 <br />5 ELECTRICAL SERVICE LUMP SUM 1 $12,000.00 $12,000.00 <br />6 IRRIGATION METER AND CONTROLS EACH 8 $3,000.00 $24,000.00 <br />7 LIFT STATION, FILTER, CONTROLS, AND APPURTENANCES* LUMP SUM 6 $55,000.00 $330,000.00 <br />8 SILT FENCE, TYPE HEAVY DUTY LIN FT 250 $3.50 $875.00 <br />9 CONCRETE PUMP PAD EACH 6 $1,000.00 $1,000.00 <br />10 CONNECT TO POTABLE WATER EACH 6 $8,000.00 $48,000.00 <br />11 4" FORCE MAIN HDPE LIN FT 36,944 $18.00 $664,992.00 <br />12 POTABLE WATER SYSTEM OVERSIZING LUMP SUM 1 $650,000.00 $650,000.00 <br />SUBTOTAL $1,955,305.00 <br />+ 10% CONTINGENCY $195,530.50 <br />CONSTRUCTION SUBTOTAL $2,150,835.50 <br />+ 20% INDIRECT $430,167.10 <br />TOTAL $2,582,000.00 <br />C. Irrigating Entire Development <br />Opinion of Probable Cost