My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/13/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
04/13/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:55:13 PM
Creation date
4/11/2016 8:53:19 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/13/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Landscape screening and buffers shall be installed along CSAH 54, I-35E <br />and in between the townhomes and commercial. <br />c. Attention shall be made to the location of landscape plantings, buffer and <br />berms in regards to grading, storm sewer and utility location, catch basins, <br />etc. <br />d. Water re -use pump stations shall be viewed to determine if screening is <br />required. <br />6. Lot Size <br />a. Lot sizes for single family lots shall be continuous buildable land and at a <br />minimum size of the Lot Width Product x 130 feet. <br />i. Example: <br />1. 44 ft x 130 ft <br />= 5,720 s.f.; <br />2. 55 ft x 130 ft <br />= 7,150 s.f.; <br />3. 65 ft x 130 ft <br />=8,450 s.f.; <br />4. 75 ft x 130 ft <br />= 9,750 s.f. <br />b. The 100 year High Water Level shall not encroach into any yard. <br />c. Wetlands and buffers shall not encroach into any yards. <br />i. See Lot 231-232. <br />d. The required 10 feet drainage and utility easement above the HWL maybe <br />included in the lot as part of the standard D&U easement. <br />7. Single Family Neighborhoods <br />a. Detailed house architectural plans, color renderings and material palette <br />shall be submitted for all single family lots abutting CSAH54, Street A <br />and the public park. <br />8. Townhome Neighborhood <br />a. A separate plan set detailing the townhome neighborhood shall be <br />required. <br />i. Details on Sheet 43 are not for 32 foot wide townhome product. <br />b. Detailed architectural plans and color renderings shall be submitted for all <br />townhome building elevations. <br />9. Parks and Trails <br />a. Details on water fountains shall be required with PUD Final Plan. <br />b. A Trail Phasing Plan shall be required with PUD Development Stage Plan <br />c. A "trail corridor" shall be installed along one side of Street B in lieu of <br />sidewalk to make a connection to the park. The trail could be bituminous <br />or concrete. <br />d. Trail location needs to be evaluated between Lot 135 and wetland. <br />10. Wetlands and Buffers <br />a. The lots surrounding Outlot A shall be evaluated to verify proper wetland <br />buffers (10-25 feet) can be established outside of lots. <br />b. Wetland area calculations differ from Sheet 23 and Wetland Permit <br />Application. Please adjust accordingly. <br />11. Water Re -use <br />a. Irrigation system for public park, berm area and townhome open space <br />shall utilize stormwater re -use as recommended in the Watermark Water <br />Re -Use Feasibility Study. <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.