My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/13/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
04/13/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:55:13 PM
Creation date
4/11/2016 8:53:19 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/13/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mattamy Homes Limited <br />Minneapolis Division <br />requirement that on 2/3 of the site can be no greater than 3.0 du/acre, a maximum yield would <br />have a unit type mix that is 44% detached (varying lot sizes) and 56% attached. Watermark's unit <br />type mix is 81% detached and 19% attached. The proposed net density is 3.45 du/acre excluding <br />wetlands. Even if all ponds, parks, stormwater ponds, wetlands and proposed open space are <br />excluded, the proposed density is still only 3.75 per acre; well below the 2.38 du/acre threshold. <br />The Comprehensive Plan allows for 70 acres of commercial. As has been discussed with the City <br />Council, the likelihood of this parcel becoming a type of commercial that would be acceptable to <br />the City is remote. 70 acres will allow for four big -box type centers; if this intensity of commercial <br />is interested in this intersection, it will be on any of the other three corners of CR 14 and 35E; <br />these corners have direct access and visibility from County Road 14. For the sake of analyzing <br />yield, even if the 70 acres of commercial were taken out of the density calculation, Watermark is <br />still only 70% of the allowable density. <br />Phasing <br />Trunk sewer and water serve the site from the south. As can be seen from the development plan, <br />the part of the site that offers the highest amenity (parks, open space, wetland complexes) and <br />greatest potential for creating an exciting arrival is in the center of the site. <br />It is Mattamy's intent to build a model center at the center entrance from County Road 54 <br />offering all 5 detached home products. It is anticipated that the central pond will be constructed <br />along with the park and community center (discussed earlier). Ideally, this part of the <br />neighborhood would open in the fall of 2017 (Phase 1). At the same time, the townhome and 44' <br />lot neighborhood would open. <br />The absorption rate of the various product types will determine exact phasing but the likely <br />scenario is that phasing will fill in the area between the central park and townhouse area, making <br />use of the infrastructure installed to serve the central park area. <br />We expect to complete the project 8-9 years after sales start, assuming a construction pace of <br />100 units per year. <br />Summary <br />Watermark is a unique solution to the natural and regulatory challenges that this site presents. <br />Its proximity to transportation and the rest of the metro area, the surrounding open space and <br />recreational areas, quality schools and a broad buyer profile offer a unique locational advantage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.