My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/11/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
05/11/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:01:01 PM
Creation date
5/6/2016 1:41:58 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/11/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />April 06, 2016 <br />Page 4 <br />10. The updated Noise Study, dated March P 2016 was reviewed. The following comments <br />should be addressed by the applicant: <br />a. The site that was shown in the wrong location on Figures 1.1, 2.1 and 2.2 has been <br />revised with the updated study memo. <br />WATER SYSTEM <br />1. Note the attached water system memo dated April 5, 2016 (Attachment 2) that outlines <br />the system needs based on the proposed development and the City's comprehensive plan. <br />2. A 12 inch diameter watermain shall be looped on the northwest end of the plat. <br />3. The 16 inch diameter watermain shall be looped through the park. <br />4. Hydrants shall be installed next to the stormwater re -use system pumps. <br />5. Fire hydrant locations shall be reviewed by the City's Fire Division staff. 300 foot <br />maximum hydrant spacing. <br />6. A hydrant shall be installed on Street F between Street G and Street C. <br />7. All hydrant leads shall be a minimum of 6 inches in diameter. <br />8. The dual 8 inch lines in Street U shall be separated as much as possible (opposite sides of <br />the road). <br />9. The 16 inch trunk watermain loop to the east shall be installed under I35E when the <br />adjacent phase of the development is constructed. This will be a City improvement <br />project. Show on the plat documents as such. <br />10. A 12 inch watermain stub is to be extended under CSAH 54 at 77th Street for future <br />looping. <br />11. An 8 inch water stub to the south shall be installed at the Townhomes (at the trail <br />location). This will provide a future loop to the south parcel. <br />SANITARY SEWER SYSTEM <br />1. An 18-inch sanitary line shall be extended along Street A to CSAH 54 and along Street B <br />to the roundabout, at maximum depth. An 8-inch sanitary line shall be stubbed under <br />CSAH 54 to the west. <br />2. Please provide either sanitary system profiles or all pipe lengths and slopes so that invert <br />elevations can be verified. <br />3. With the second phase of the development, assuming phase one has approximately 100 <br />residential connections, the lift station No. 8 pump upgrade will need to be completed. <br />This will be a City improvement project. <br />TRANSPORTATION <br />1. The traffic study, dated February 13, 2015 and latest technical memo dated March 25, <br />2016 prepared by Spack Consulting still needs to be refined as detailed below. <br />However, we generally concur that the development can be accommodated with the <br />roadway system proposed. <br />2. The Watermark development access spacing was reviewed in coordination with Anoka <br />County staff during the concept plan review stage. The access spacing is also in <br />conformance with those outlined in the AUAR completed for this area. The access was <br />KA02029-82044dn in\Docs\20160516 Engineering Review Lino Lakes-Mattamy.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.