My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-06-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
06-06-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 3:33:02 PM
Creation date
6/7/2016 9:28:11 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/06/2016
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Feasibility Report <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 02029-790 Page 4 <br />3. EXISTING CONDITIONS <br /> <br />3.1. Drainage Areas and Drain Tile <br /> <br />The Northeast Area is serviced by three Anoka County drainage systems, Anoka County Ditch <br />(ACD) 72 and Judicial Ditch (JD) 2 in the north and ACD 55 in the south (FIGURE 2). ACD <br />72 and JD 2 discharge directly to Peltier Lake, while ACD 55 enters Clearwater Creek, or <br />Judicial Ditch (JD) 3, to the south before discharging into Peltier Lake. The remainder of the <br />study area surface flows directly to Peltier Lake. <br /> <br />The county ditches within the study area are all agricultural drain tile systems that serve an area <br />of approximately 1,400 acres within the Cities of Lino Lakes, Centerville, and Hugo. These <br />properties are entitled to the benefits of the drainage system and, in effect, own the drain tile <br />system under Minnesota Statues 103E (Minnesota Department of Natural Resources 1991). The <br />drainage of the system must be maintained in perpetuity, until such time the assessed land <br />owners choose to petition RCWD for the abandonment of the drain tile on their property. <br /> <br />The majority of the land in the study area is agricultural (Table 1) and drained to the ditch <br />system via unbuffered surface inlets (Appendix A, Figure 3). <br /> <br />Table 1. Existing land uses and areas <br />Land Use Area <br />(acres) <br />Agricultural 1,059 <br />Multifamily 2 <br />Open Space/Conservation 116 <br />Right-of-Way 43 <br />Rural Residential 141 <br />Single Family Detached 12 <br />TOTAL 1,373 <br /> <br />The low points in the study area remain inundated for weeks following the 100 year event due to <br />the limited pipe capacity in the ditch system. Because the low lying areas take so long to drain <br />back to their normal water levels, the next rain event may compound the flooding beyond the <br />100-year flood level. Without any drainage improvements, future developments in this area are <br />required to design to retain the 100-year back-to-back events. <br /> <br />3.2. Storm Sewer <br /> <br />There is storm sewer within the study area of Lino Lakes along Otter Lake Road and the <br />McDonald’s site. Due to the limited capacity of the existing drain tile system, McDonald’s was <br />required to install a temporary spray irrigation system to reduce the stormwater volume from <br />their site; however this is not a feasible long-term solution. The City of Hugo has stormwater <br />infrastructure and storage which serves the development along the Lino Lakes and Hugo border. <br />
The URL can be used to link to this page
Your browser does not support the video tag.