Laserfiche WebLink
<br /> <br /> <br />Feasibility Report <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 02029-790 Page 12 <br />pipelines. It is anticipated that coordination with the Koch Pipeline Company will be required in <br />order to construct the project as proposed. <br /> <br />4.9. Wetlands <br /> <br />All practical measures will be taken to prevent any inadvertent temporary drainage of wetlands <br />from the construction and placement of the new pipeline and outfall to Peltier Lake. These <br />practices include using bentonite plugs and/or steel casing for the areas where the pipeline runs <br />through wetlands, and prohibiting the use of gravel bedding under the pipeline in these areas.