My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/08/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
06/08/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:33:59 PM
Creation date
6/7/2016 2:01:38 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/08/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br />1) THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND <br />LOCATION OF EXISTING UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL <br />INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN <br />DETERMINATION AS TO TYPE AND LOCATION OF UTILITIES AS NECESSARY TO <br />AVOID DAMAGE TO THESE UTILITIES. <br />2) CALL "811" FOR EXISTING UTILITIES LOCATIONS PRIOR TO ANY EXCAVATIONS. <br />3) INSTALLATIONS SHALL CONFORM TO THE CITY STANDARD SPECIFICATIONS <br />AND DETAIL PLATES. <br />4) THE CONTRACTOR SHALL NOTIFY CITY PUBLIC WORKS DEPARTMENT A <br />MINIMUM OF 24 HOURS PRIOR TO THE INTERRUPTION OF ANY SEWER OR WATER <br />SERVICES TO EXISTING HOMES OR BUSINESSES. <br />5) STORAGE OF MATERIALS OR EQUIPMENT SHALL NOT BE ALLOWED ON PUBLIC <br />STREETS OR WITHIN PUBLIC RIGHT—OF—WAY. <br />6) NOTIFY CITY A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF <br />CONSTRUCTION. <br />CURB & BITUMINOUS NOTES <br />1) REMOVAL AND DISPOSAL OF EXISTING STREET MATERIALS AS REQUIRED FOR <br />CONSTRUCTION IS CONSIDERED INCIDENTAL. <br />2) SAW —CUT EXISTING BITUMINOUS AND CONCRETE CURB TO PROVIDE <br />BUTT —JOINT. <br />3) RESTORE DISTURBED STREET TO EXISTING OR BETTER SECTION. <br />4) BACKFILLING OF CURB IS INCIDENTAL TO CURB INSTALLATION. <br />5) CURB ENDS SHALL TERMINATE IN A THREE—FOOT BEAVER TAIL. <br />WATER MAIN NOTES <br />1) EXISTING WATER MAIN LOCATION AND SIZE SHALL BE VERIFIED IN THE FIELD <br />PRIOR TO CONSTRUCTION. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO <br />ANY INSTALLATIONS. <br />2) PROVIDE PIPE INSULATION WHERE SEWER (SANITARY OR STORM) CROSSES <br />WITHIN 18" OF WATER MAIN. <br />3) PROPOSED WATER MAIN SHALL BE DIP CLASS 52. <br />4) TRACER WIRE WILL BE LAID WITH ALL PVC WATER MAINS, VALVE BOXES, <br />AND HYDRANTS (IF APPLICABLE). <br />5) MAINTAIN MINIMUM 7.5—FT COVER TO TOP OF ALL WATER MAIN PIPE. <br />6) PLACE HYDRANTS 5—FT OFF BACK OF CURB. <br />SANITARY SEWER NOTES <br />1) EXISTING SANITARY SEWER LOCATION, SIZE, AND ELEVATION SHALL BE <br />VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. NOTIFY ENGINEER OF ANY <br />DISCREPANCIES PRIOR TO ANY INSTALLATIONS. <br />2) PROPOSED SANITARY SEWER MAIN SHALL BE PVC SDR 35 AND SDR 26. <br />STORM SEWER NOTES <br />1) FIELD VERIFY SIZE, ELEVATION, AND LOCATION OF EXISTING STORM SEWER <br />AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO ANY INSTALLATIONS. <br />2) WHEN CALLED OUT AS RCP, STORM SEWER SHALL BE REINFORCED <br />CONCRETE PIPE (RCP) ANSI C76 WITH R-4 GASKETS. <br />3) STORM SEWER LENGTHS INCLUDE THE LAYING LENGTH OF THE FLARED —END <br />SECTION. LAYING LENGTH OF APRON TO BE DEDUCTED FROM PAYMENT LENGTH <br />OF PIPE. <br />4) STORM SEWER PIPES TO BE JOINED TO THE CATCH BASIN MANHOLES W/ <br />APPROVED RESILIENT RUBBER JOINTS TO MAKE THEM GASTIGHT OR <br />WATERTIGHT. CEMENT MORTAR JOINTS ARE PERMITTED ONLY FOR REPAIRS <br />AND CONNECTIONS OF EXISTING LINES CONSTRUCTED WITH SUCH JOINTS. <br />p(-)NIfl W\A/1 <br />TYPICAL POND DETAIL <br />--- ------------------------ z-- <br />\m\ <br />z- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br />cOrhp OOi�OO uiN \T-------v - <br />d�d Sl ooc p �� mm ' \ \ r,O vU n <br />OZZ F- d> \ \ �N � <br />V O Z Z Z <br />- Ud» � �--- mOZ <br />m ,sl » » ��— <br />oro LLj � ® oz o0 0 >�� \ \\ Uoz <br />o u000 <br />moz <br />L pd> I <br />�� moz VQ <br />—_— — _ — — — — — _ — — — — — — — — — — — — — —------- ----- --oa o-�—.. %z __-___ <br />v--____ — --_ — _ ----_— _ --_— �__—_—_—_—_ --- a- --------------- _-- �=o� �_ _ — <br />��------ _—— — — ---- — _------- �� <br />--� -------------------------------------------- —rT— --- — ---_-- --_--- _------- — -- —_ <br />Know whats below. -- — —_--_ _—--------------------------------------- --- -----_ _ --- — <br />�oo �� — --- ---- _ -- — — 1 <br />s�lv1 Va �0 3oa3 = Ni --- —------------------------------- __-- __— __------------ °� Uo i — <br />CaII before you dig Z9� <br />�— 9' 606 — rnnF n' l06— — — — — — — / ■ < 9 BBB— O'l06 0-1 ng — — b31VM �0 3003 % <br />— <br />DRAWN BY: DESIGN BY: <br />A.G. A.G. <br />CHCKD BY: PROD. NO. <br />C.W.P. 16-1604 <br />ORIGINAL DATE: <br />MAY 16, 2016 <br />z <br />O <br />H <br />a <br />V <br />N <br />W <br />0 <br />z <br />O <br />N <br />W <br />Er <br />W <br />Q <br />0 <br />m <br />W <br />z QLLLU <br />}awZ <br />a2gz— <br />z <br />Nma3� <br />Lij�CHWO <br />6 <br />J <br />ZQLLJ <br />~OZ2N <br />WaNW <br />X c0 <br />Nx <br />0LL� <br />T <br />N <br />LLI LL <br />UmN�O <br />r <br />>-W>acn <br />W LLI <br />o <br />Wa a WJ <br />x�NWI <br />Q <br />J <br />W <br />W <br />< <br />W <br />E <br />V <br />H <br />Z <br />w <br />aw <br />W <br />V <br />Z <br />�w <br />H <br />N <br />as <br />Q <br />N <br />W <br />N <br />Y <br />Q cn <br />Z <br />Z N <br />W <br />O <br />? <br />J <br />w <br />oC <br />J <br />V <br />m <br />a <br />PREPARED FOR: <br />UNITED <br />PROPERTIES <br />SITE PLANNING <br />& ENGINEERING <br />PLOWE <br />ENGINEERING, INC. <br />6776 LAKE DRIVE <br />SUITE 110 <br />LINO LAKES, MN 55014 <br />PHONE: (651) 361 -8210 <br />FAX: (651) 361 -8701 <br />0 30 60 <br />SCALE: 1" = 60' <br />
The URL can be used to link to this page
Your browser does not support the video tag.