My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/08/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
06/08/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:33:59 PM
Creation date
6/7/2016 2:01:38 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/08/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />June 2, 2016 <br />Page 3 <br />TRANSPORTATION <br />1. The private roadways are shown as 24 feet face to face and should be the City standard <br />26 feet back to back. <br />2. The turnarounds on Street 4 should be extended. <br />3. We recommend that the trail easement at Outlot C be reviewed and adjusted as needed. <br />WATER SYSTEM <br />4. The watermain in Street 4 should be 8 inches. <br />5. Gate valves shall be at intersections (one less than legs) and are required on all hydrant <br />leads. <br />6. Identify proposed water service locations and curb stop elevations at the right of way. <br />7. Add hydrants at approximately 8+50 and 3+00 (midblock) to provide fire protection. <br />8. Add note that watermain including valves, fittings, hydrants, and appurtenances is to be <br />wrapped in polyethylene film. <br />9. Add note that fittings shall be ductile iron Class 350 compact fusion -bonded epoxy <br />coated. <br />10. Show horizontal separation on plans between sanitary sewer and watermain as 10' min. <br />SANITARY SEWER SYSTEM <br />Sanitary services require a tracer wire and access to wire ends for future locating <br />requirements. <br />2. The average and peak sanitary flows were calculated using the MCES Hourly Peaking <br />Factor for the proposed 90 residential units. Using these conservative future sanitary <br />flows, an analysis was conducted to determine if the current Legacy Woods Edge lift <br />station design has sufficient capacity. Following the analysis, the sanitary lift station <br />design was determined adequate to incorporate the proposed sanitary flows. <br />STORM SEWER SYSTEM <br />1. The storm sewer between CB 71 and CBMH 70 shall have 10 feet of horizontal clearance <br />form existing water main alignment. <br />2. The applicant should shift the rear catch basin in the green space of Block 2 such that the <br />pipe running to the street is equally spaced between Lots 7 and 8. <br />\\mspfsv02.lps.Imal\StudiosWctive Projects\CLL16006 - Woods Edge in Lino Lakes MN\From Others (Original <br />Data)\20160606 Engineeting Review Lino Lakes Woods Edge.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.