My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-27-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
06-27-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 3:50:45 PM
Creation date
6/29/2016 9:57:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/27/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft – 10/1/15 <br />Functional Design and Performance Specifications: <br />The project design is so conceptual in nature, the sizes, types, lengths, slopes and characteristics of the <br />proposed infrastructure remain undefined. Only the sizes, types, lengths, slopes and characteristics of <br />select pipes included in the model submittal have been defined. The following summarizes those <br />physical features either described in the written submittals or the model submitted by WSB on <br />September 11, 2015 (and reviewed by HEI), which related to project performance. Project performance <br />is defined as the 2-year 24 hour, 10-year 24-hour and 100-year critical duration peak discharge and <br />runoff volume or the timing of flood peak (i..e., the specific discharge hydrographs for these events). <br />Pipe Infrastructure <br />Outlet Pipe 72-inch RCP estimated length 4,116 feet @ 0.19% <br />slope <br />I 35E Culvert(s) 60-inch RCP <br />Drainage Area Characteristics <br /> Total Land Area Served by the Outlet 1,430 acres total; 1,415 acres excluding I 35W <br /> Current Amount of Impervious Area (acres) <br /> Hugo region – 71 <br /> East region – 16 <br /> Central region – 11 <br /> West region – 10 <br /> Total – 108 <br />Maximum Allowable Increase Impervious Area At Full Development (acres) <br /> Hugo region - ** <br /> East region – 290 <br /> Central region –170 <br /> West region –72 <br /> Total –532 acres <br />Maximum Allowable Total Impervious Area At Full Development (acres) <br /> Hugo region - ** <br /> East region – 306 <br /> Central region –181 <br /> West region –82 <br /> Total –640 <br /> <br />** no more than existing conditions peak discharge for the 2-year, 24-hour; 10-year, 24-hour; and 100- <br />year, 24-peak discharge from the City of Hugo to the City of Lino Lakes estimated at 35.4 cfs for the 100- <br />year, 24-peak discharge. This discharges is based on adding the hydrographs for nodes CA55MTL_012, <br />CA55MTL_013, CA55MTL_011, and CA55MTL_025A from the proposed WSB InfoSWMM model, <br />submitted 9-11-2015 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.