Laserfiche WebLink
Lino Lakes Outlet Study <br />January 22, 2015 <br />Page 3 <br /> <br /> K:\02029-790\Admin\Docs\Outlet Alternatives Memo_Sequencing.doc <br />Western Pipe Option 4. Option 2 in the western parcel would skirt north around a large wetland <br />and continue to Peltier Lake. Option 4 in the western parcel would skirt south around a large <br />wetland and continue to Peltier Lake. The large wetland in the west central portion of the parcel <br />could be avoided by both options. <br /> <br />Benefits of this option: <br />• Minimal temporary wetland impacts anticipated with pipe placement. Because a <br />pipe would be used, no secondary impacts resulting from lateral effect area <br />expected. <br />• No impacts to Wetland Preservation Corridor. <br />• Can easily drain north and south sections of western parcel. <br />Drawbacks of this option: <br />• Western parcel property owner prefers an option that utilizes more of the low land <br />to the south of the parcel. <br />o Option 4 utilizes more low area than Option 2 <br /> <br />Alternative 3: <br />Western Pipe Option 3 (Southern pipe): Through the Eastern Parcel, the pipe could use Eastern <br />Pipe Option 1 or Eastern Pipe Option 2 and connect under 20th Avenue to Western Pipe Option <br />3. Eastern Pipe Option 2 is likely the more appropriate option in the eastern parcel. The pipe <br />would travel south along 20th Avenue to near the southern border of the parcel and then move <br />west/northwest through the narrowest portion of the wetland located in the southeast corner of <br />the parcel. The pipe would outlet to Peltier Lake. <br /> <br />Benefits of this option: <br />• Utilizes the low areas of the parcel (landowner preference). <br />• No permanent impacts to Wetland Preservation Corridor. <br />Drawbacks of this option: <br />• Results in at least 9,165 sf of temporary wetland impacts. <br />• Less direct connection to the outlet at 20th Avenue. <br /> <br />Preferred Alternative: <br />Based on the alternatives analysis, WSB & Associates would recommend using Alternative <br />Eastern Pipe Option 2 in combination with Western Pipe Option 2 (Figure 3). As described <br />above, this alternative allows for both the north and south sections of the western parcel to be <br />drained and avoids wetland impacts.