My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-27-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
06-27-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 3:50:45 PM
Creation date
6/29/2016 9:57:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/27/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Outlet Study <br />January 22, 2015 <br />Page 3 <br /> <br /> K:\02029-790\Admin\Docs\Outlet Alternatives Memo_Sequencing.doc <br />Western Pipe Option 4. Option 2 in the western parcel would skirt north around a large wetland <br />and continue to Peltier Lake. Option 4 in the western parcel would skirt south around a large <br />wetland and continue to Peltier Lake. The large wetland in the west central portion of the parcel <br />could be avoided by both options. <br /> <br />Benefits of this option: <br />• Minimal temporary wetland impacts anticipated with pipe placement. Because a <br />pipe would be used, no secondary impacts resulting from lateral effect area <br />expected. <br />• No impacts to Wetland Preservation Corridor. <br />• Can easily drain north and south sections of western parcel. <br />Drawbacks of this option: <br />• Western parcel property owner prefers an option that utilizes more of the low land <br />to the south of the parcel. <br />o Option 4 utilizes more low area than Option 2 <br /> <br />Alternative 3: <br />Western Pipe Option 3 (Southern pipe): Through the Eastern Parcel, the pipe could use Eastern <br />Pipe Option 1 or Eastern Pipe Option 2 and connect under 20th Avenue to Western Pipe Option <br />3. Eastern Pipe Option 2 is likely the more appropriate option in the eastern parcel. The pipe <br />would travel south along 20th Avenue to near the southern border of the parcel and then move <br />west/northwest through the narrowest portion of the wetland located in the southeast corner of <br />the parcel. The pipe would outlet to Peltier Lake. <br /> <br />Benefits of this option: <br />• Utilizes the low areas of the parcel (landowner preference). <br />• No permanent impacts to Wetland Preservation Corridor. <br />Drawbacks of this option: <br />• Results in at least 9,165 sf of temporary wetland impacts. <br />• Less direct connection to the outlet at 20th Avenue. <br /> <br />Preferred Alternative: <br />Based on the alternatives analysis, WSB & Associates would recommend using Alternative <br />Eastern Pipe Option 2 in combination with Western Pipe Option 2 (Figure 3). As described <br />above, this alternative allows for both the north and south sections of the western parcel to be <br />drained and avoids wetland impacts.
The URL can be used to link to this page
Your browser does not support the video tag.