My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-27-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
06-27-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 3:50:45 PM
Creation date
6/29/2016 9:57:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/27/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Feasibility Report <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2029-790 Page 7 <br />must limit stormwater discharge rates to no more than 1% of the existing runoff rates (Houston <br />Engineering, Inc. 2013). In addition to limiting runoff rates, new developments must also treat <br />their stormwater onsite to meet the water quality and volume reduction requirements of Rule C. <br />Unfortunately the soils underlying the majority of the study area are poorly suited for infiltration <br />and cannot meet the volume reduction requirement of Rule C. This has resulted in temporary <br />infrastructure being built for stormwater irrigation because there was not an alternate way to <br />meet the RCWD rules for surface water quality and storage. <br /> <br />In addition to poor underlying soils, the study area also has a significant amount of wetlands <br />(Appendix A, Figure 4), which limit stormwater management opportunities. A detailed wetland <br />analysis is included in Appendix C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.