My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/13/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
07/13/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:58:11 PM
Creation date
7/12/2016 12:16:19 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/13/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. The easement appears to be 30 feet in some locations and this shall be <br />revised. <br />b. The easement shall also allow for drainage and utilities. <br />9. A minimum 10 feet of separation shall be required between the proposed trail and <br />the existing driveway at 441 Birch Street. <br />a. The trail appears to be less than 10 feet from the existing driveway in <br />some locations. This shall be revised. <br />10. Due to the unique "boulevard loop", it is important to note the property owners <br />shall be responsible for mowing and maintaining the right of way boulevard. <br />11. The existing trail along the north side of Birch Street shall be shown on the <br />preliminary plat. <br />12. Details regarding the temporary access to Birch Street for construction traffic <br />shall be provided on the plans and a timeframe for use shall be included. <br />13. Any lot extending into the floodplain shall be required to obtain a FEMA LOMA <br />prior to issuance of a building permit. <br />14. Upon final plat, the applicant shall submit HOA documents detailing the <br />maintenance plan for the infiltration basin in the boulevard loop. <br />ATTACHMENTS <br />1. Site Location Map <br />2. City Engineer letter dated July 7, 2016 <br />3. Environmental Coordinator letter dated June 29, 2016 <br />4. Revised civil plans prepared by Plowe Engineering dated June 27, 2016 and <br />received by the City on June 24, 2016 <br />5. Revised preliminary plat plans prepared by EG Rud & Sons dated June 24, 2016 <br />and received by the City on June 24, 2016 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.