My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/13/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
07/13/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:58:11 PM
Creation date
7/12/2016 12:16:19 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/13/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building a legacy —your legacy. <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Diane Hankee PE, City Engineer <br />Date: June 28, 2016 <br />Re: Clearwater Creek Business Park <br />Plan Review for AUAR Conformance <br />WSB Project No. 2029-820 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the plans for Clearwater Creek Business Park in Lino Lakes, MN prepared by <br />Plowe Engineering, Inc. received on June 17, 2016 for conformance with the AUAR. <br />For reference please see notes on the Mitigation checklist enclosed, along with the following <br />comments. <br />FISH, WILDLIFE, ECOLOGICALLY SENSITIVE RESOURCES <br />1. AUAR Mitigation Item 11.1. The AUAR highlights this area as part of the Conservation <br />Design Framework (CDF) with a future greenway corridor and trail from Cedar Street <br />north through the property. Clearwater Creek (JD3) is located within the parcel and a 100 <br />foot buffer is recommended per the mitigation plan. This measure is satisfied by the <br />creation of a natural corridor running parallel with the creek. <br />• A 50 foot conservation easement is proposed on Outlot A measured from the <br />centerline of the ditch. This should be adjusted to measure 50 feet from the <br />Top of Bank. Additional protections may be considered with future <br />development of this lot. <br />Lot 1, which is being developed, establishes a buffer along the creek ranging <br />from 20' in the far NE corner of the lot to over 150 feet in width along the <br />length of the creek. The area is further buffered by the construction of <br />stormwater management ponds between the buffer area and site parking <br />areas. The proposed conservation easement should be modified to include all <br />the area between the creek, stormwater ponds and parking area. <br />A trail will be constructed along 21 st Avenue with the future extension of 21 st <br />Avenue to Cedar Street. <br />2. AUAR Mitigation Item 11.8. The AUAR requires an eagle nest survey. At the time of <br />the AUAR update (June 2015); the DNR did not have records of any eagle nests within 1 <br />mile of the project area. There are not many trees on the site, but those that are present <br />Equal Opportunity Employer <br />wsbeng.com <br />\\mspfsv02.lps.local\Studim\Aaive Projects\CLL16007 - Clearwater Creek Business Park in Lino Lakes MN\Erom Others (Original Data)\20160628 Engineering Review Lino Lakes-CCBP.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.